Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 30, 2023 SAM #7915
SOLICITATION NOTICE

Y -- Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project

Notice Date
7/28/2023 6:28:43 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST NEW YORK NEW YORK NY 10278-0004 USA
 
ZIP Code
10278-0004
 
Solicitation Number
W912DS23B0013
 
Response Due
8/8/2023 12:00:00 PM
 
Archive Date
08/23/2023
 
Point of Contact
Orlando Nieves, Nicholas P. Emanuel, Phone: 9177908069
 
E-Mail Address
orlando.nieves@usace.army.mil, Nicholas.P.Emanuel@usace.army.mil
(orlando.nieves@usace.army.mil, Nicholas.P.Emanuel@usace.army.mil)
 
Description
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging and beach nourishment of Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project, New York. The work consists of dredging the Fire Island Inlet Federal Navigation channel and deposition basin with subsequent placement of the dredged sand as nourishment along the designated feeder beach (Gilgo Beach, Suffolk County, New York). The proposed dredging and beach nourishment work would involve dredging and placement of approximately 1,000,000 CY of sand at Gilgo Beach, subject to available funding. The project is scheduled to be dredged to a depth of 14 feet plus 2 feet allowable over-depth. The purpose of the proposed work is to alleviate the effects of shoaling and maintain the project dimensions, thereby providing safe and economical use of the Fire Island Inlet waterway by commercial and recreational boating interests while providing beneficial use of the dredged sand. Between maintenance operations, the bypassed sand placed at the feeder beach would be carried by littoral drift to feed down drift beaches. The maintenance operation would thus serve to place sand trapped in the channel back into the normal littoral movement that naturally replenishes the western beaches, while maintaining a safe channel for navigation. The proposed work can be accomplished by large pipeline dredge and must meet US Coast Guard criteria for an �ocean going vessel�. The Contractor will be required to commence work within five (5) calendar days after the date of receipt by him of the notice to proceed, and to prosecute said work diligently and to complete the basic work ready for use not later than one hundred fifteen (115) calendar days after the receipt by him of the notice to proceed (NTP). The contractor is required to maintain an integrated production of at least 12,500 cubic yards per calendar day. The work is estimated to cost between $10,000,000 and $100,000,000. Plans and specifications for the subject project would be available in June 2023, with bid opening in July 2023. It is the intention of the government to award and NTP in August 2023. Liquidated Damages of $2,790.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted Procurement.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/aeeca056e9694b94b82c1e7e07ab2c4d/view)
 
Place of Performance
Address: Ocean Beach, NY 11770, USA
Zip Code: 11770
Country: USA
 
Record
SN06768247-F 20230730/230728230048 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.