SPECIAL NOTICE
C -- 558-23-100 A/E | Correct Bridge and Garage Deficiencies Request for SF330 VAMC, Durham NC
- Notice Date
- 8/2/2023 5:59:20 AM
- Notice Type
- Special Notice
- Contracting Office
- 246-NETWORK CONTRACTING OFFICE 6 (36C246) HAMPTON VA 23667 USA
- ZIP Code
- 23667
- Solicitation Number
- 36C24623R0093
- Response Due
- 8/21/2023 12:30:00 PM
- Archive Date
- 11/28/2023
- Point of Contact
- Angela Wilson, Contract Specialist, Phone: 910-488-2120 x5199
- E-Mail Address
-
angela.wilson4@va.gov
(angela.wilson4@va.gov)
- Awardee
- null
- Description
- DEPARTMENT OF VETERANS AFFAIRS Durham VA Health Care System 508 Fulton Street Durham, NC 27705 SCOPE OF WORK Correct Bridge and Garage A Deficiencies Project Number: 558-23-100 BACKGROUND The VAMC in Durham, NC is located on over 17 acres and has multiple buildings. The campus has a 60 long vehicle bridge to enter Building 23 (Garage A) from the entrance road which has deficiencies discovered in a recent inspection report. SCOPE OF WORK Location of Work: This project location is the bridge from the campus entrance road into Garage A 1st level. Work must be done in a manner to minimize disruption to medical center operations. Codes and Standards: This project will meet but is not limited to the following most recent codes and standards. All applicable VA TIL All applicable North Carolina Structural Building codes for bridges All applicable building codes for parking structures if modifications need to be done to Garage A. Architect-Engineering Services: Code Analysis - As part of the design the A/E will provide a detailed code analysis (per applicable codes) and comprehensive review of existing conditions for the pedestrian bridge and issues raised by Attachment A, Bridge Inspection report dated 9-7-21. Design Scope A full design will be created by the A/E based, in part, on the deficiencies found in Attachment A. The A/E will provide a design repairing the deficiencies of the vehicle bridge and Garage A structure. Design: Provide design documents with working drawings, specifications and cost estimate at 30%, 60%, 90%, and 100% design stages Design Deliverables: Design Report (included in Part I submission): Prior to the initiation of any detailed design, the A/E shall, in conjunction with representatives of the Engineering Department, review documentation, conduct department interviews and tour project areas. Next the A/E will develop various alternatives, which will be presented to the Engineering Department for selection with ROM construction estimates. Part I - 30% Submission: The requirements are working drawings at the 30% stage, marked-up specifications, and a detailed construction cost estimate showing a quantitative survey of all labor and material. Submit 8 half size set of drawings (22 x 34 ) on bond paper, 2 copies of the marked-up specifications, 1 copy of the preliminary construction cost estimate, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications (.docx and .pdf) on a CD-ROM. Part II - 60% Submission: The requirements are working drawings at the 60% stage, marked-up specifications, and a detailed construction cost estimate showing a quantitative survey of all labor and material. Submit 1 full size set of drawings (30 x42 ) on bond paper, 4 half size set of drawings (22 x 34 ) on bond paper, 4 copy of the marked-up specifications, 1 copy of the preliminary construction cost estimate, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications on a CD-ROM. Part III - 90% Submission: The requirements are complete construction drawings showing all details and views, updated detailed cost estimate, and finalized specifications. Submit 1 full size set of drawings (30 x42 ) on bond paper, 4 half size set of drawings (22 x 34 ) on bond paper, 4 copy of the marked-up specifications, 1 copy of the preliminary construction cost estimate, and an electronic copy of the drawings(.pdf and AutoCAD) and specifications on a CD-ROM. Part IV - Final 100% Submission: Provide 1 set of drawings (30 x42 ) on bond paper, 4 sets of half size drawings on bond paper, a set of unbound specifications, and an electronic copy of the drawings(.pdf and AutoCAD) and specifications on a CD-ROM. The design deliverables must adhere to the following requirements: Specifications: The project specifications shall be prepared in Microsoft Word by the A/E from the VA Master Specifications. The general format shall include; Part 1-General, Part 2-Products, and Part 3-Execution. Part 1 verbiage shall include the general requirements, identify applicable standards, and identify submittals required for a particular specification. This information should be directly related and correspond to a specific submittal number enumerated in the Submittal Register as identified below. Part 2 shall include description of the salient characteristics of the products. Part 3 shall include a description of the methods used to install items of construction. The A/E shall identify all VA Master Specification sections applicable to the project and edit them accordingly to fit the scope of work. If additional specification sections are needed that are not listed in the VA Master Specs, the A/E is responsible to write and edit an appropriate CSI format specification section. Specifications shall be printed on 8 ½ x 11 bond paper using 12pt Times-New-Roman fonts. The A/E shall incorporate into the specifications and its construction site inspection procedures the applicable Infection Control and Dust Control provisions. Construction Cost Estimates: The A/E shall prepare Construction Cost Estimates in Microsoft Excel using the CSI 34-division format. The Cost Estimates shall include a copy of the quantity take-offs, breakdown of individual line items that accurately reflect the quantity take-off of the various categories of work involved, unit of measure, quantities, unit cost, overhead, and profit. All cost data shall be taken from the most current version of a recognized industry standard, e.g. Means Estimating Guides. For items that are not in the industry standards, vendor quotes and justification for labor hours shall be provided. Construction Cost Estimates shall be submitted with 60%, and 100% design reviews and for the final submission. As part of the cost estimating effort, the A/E shall provide a Schedule of Values such that discrete elements of the Specifications are identified and may be used in negotiations with a proposal bidder. Submittal Register: The A/E shall develop a list of all uniquely identified submittals required by the specifications in Section 1 of each individual specification. This submittal register should be submitted to the COR for approval in Microsoft Excel using the CSI 34-division format. The register should include specification reference, and item to be reviewed/approved and correspond to the Submittal Requirements as identified in the Specification Section addressed in paragraph above. Narratives: Written narratives shall be used as part of each design submission. The narrative should be used to elaborate on and provide an explanation of key design decisions by A/E and/or the VA, objectives, obstacles, alternatives and resolutions, design issues or decisions relating to constructability, and in general to communicate all information relevant to the design submission. Reproduction: The A/E shall be responsible for all reproduction during design; however, only materials which are submitted to the VA for design reviews shall be reimbursable. All other reproduction for in-house reviews, consultants, etc. shall not be reimbursed. Note that all bid administration activities will be performed by the VA Contracting office. Submission Due Dates: Part I - 30% Submission Due: 30 Days from NTP VA Review (14 days) 44 Days from NTP Part II - 60% Submission Due: (21 days) 65 Days from NTP VA Review (14 days) 79 Days from NTP Part III - 95% Submission Due: (21 days) 90 Days from NTP VA Review (14 days) 104 Days from NTP Part IV - Final 100% Documents Due: (14 days) 118 Days from NTP Note: The VA will have 3 weeks to review each submission 30%, 60%, 95% and 100%. Construction - Provide construction period services which shall include submittal review and as-built preparation. Bidder Site Visit: Participate and facilitate this site visit in conjunction with the Contracting Officer and COR, contractors, and representatives of the Building Committee as needed. At this meeting, potential contractors will walk the site limits to discuss the scope of work. The AE shall also be required to evaluate RFI s resulting from the Bidder Site Visit, in order to clarify project requirements. Pre-Construction Meeting: Participate and facilitate this meeting in conjunction with the Contracting Officer and COR, contractor, and representatives of the Building Committee as needed. At this meeting the staging area and work site rules shall be discussed again with the contractor (these should already be included in the specifications). Contract specifications should require a construction schedule submitted within 14 calendar days from the Notice to Proceed. Submittal Review and Logs: Designer shall prepare and maintain a log of key submittals and of RFIs and provide the same to the Contracting Officer and COR. Reviewed submittals are to be returned within 10 working days to the COR. Designer is fully responsible for review of all submittals, retaining a record copy of submittals for turn over to the owner upon project completion, and communication with the contractor regarding any deficiencies or changes required to the submittals. Response to RFI s: The A/E shall be responsible for evaluating RFI s to determine if a change will be required. The A/E shall then provide recommendations to the Contracting Officer. Within 48 hours, the A/E shall provide in writing the information, clarification or revision material needed to properly answer the RFI and to resolve the issue. The A/E shall include a cost/credit estimate for RFI s which result in a change to contract cost. Construction Change Orders: Designer shall prepare the Statement of Work and Cost estimates (returned within 10 calendar days) as needed. Monthly Site Inspections: Designer shall meet monthly with the contractor, COR and others needed to inspect the progress of the construction and report any deficiencies to the same. Monthly Progress Meetings: In conjunction with the monthly site inspection, the designer shall hold formal progress meetings with contractor, contracting officer, and COR. At these meetings the agenda shall contain a narrative of work completed the previous month, work upcoming, submittals or RFIs outstanding, schedule update, any special coordination items requiring actions, and discussion of change orders or time extension requests. Minutes of this meeting shall be issued within 3 working days of the meeting. Project Close Out: Designer shall receive notice of intent for final inspection from the COR, and contractor shall propose a time and place for this to occur in conjunction with the Contracting Officer and the COR. Following the final inspection, the designer shall issue a punch list. Contract documents shall specify that the contractor has 15 calendar days to complete the punch list, and notify the designer for re-inspection. Following re-inspection and project acceptance the closeout phase will occur. Record Drawing Submission: Provide 2 updated sets of drawings (30 x42 ) on bond marked as As-built Drawings that include the contractor s mark-ups and also an electronic copy of these updated drawings on CD in DWG and PDF formats. Construction Amount: The project is to be designed within an estimated base construction cost of less than $900,000.00. If the base bid cost exceeds budget, the A/E shall redesign or take steps necessary to reduce cost, so the budget limitations are not exceeded. Storage: No storage of any material will be allowed on VA property unless approved by the COR. Payment of stored materials is not permitted. All pay applications will be paid based on competed installations. Period of Performance: Vendor shall complete this project NLT than 118 days after issue of notice to proceed (NTP). Hours of Operation: Services shall be performed during VA working 1st shift. For working outside the above-mentioned shifts, the vendor shall give 3-day notice to the Contracting Officer so that arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later. Utility and System or Service Outages: No utility service such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director s prior knowledge and written approval. The vendor shall submit a request to interrupt any such services to COR, in writing, 4 weeks in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption Safety and Regulations: Contractor will be responsible to have technicians trained to meet Durham VA Medical Center specifications. Contractor will also be responsible to work with Durham VA Health Care System, Engineering Department on Safety and Infection Control standards. Contractor will always keep all tools and parts in a safe manner and under control. Contractor will meet all OSHA standards for Employee safety. The contractor shall not be allotted any parking permits for onsite parking. If work is needed to be performed outside of normal working hours, the contractor shall be responsible to checking in with the VA Police to request permission to park on site as designated by the VA Police. General Requirements All work shall be in accordance with the VA master specification (01 00 00). Vendor shall meet the requirements for quality control construction projects per spec section 01 45 00. All safety requirements from spec 01 35 26 must be met. The vendor s employees shall not enter the work site without appropriate badges issue through the safety office. They may also be subject to inspection of their personal effects when entering or leaving the project site. Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor s personnel, except as permitted by COR where required by limited working space. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads per NFPA 101 and VA requirements. Minimize disruptions and coordinate with COR. All buildings will be occupied during performance of work. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the installation period. Competent, experienced, licensed or certified workers shall perform crafts requiring specialized skills. All work shall be performed in full accordance with applicable local and Federal regulations. All equipment and installation shall conform to the VA master specifications (01 00 00). All equipment and installation shall conform to all applicable requirements of ASHREA, National Fire Protection Association (NFPA), plumbing and mechanical codes, and National Electrical Code (NEC). No departures from specification requirements will be permitted without written approval. The contractor shall use good safety practices while working. All hardware shall be installed in such a manner to minimize damage and maximize patient and employee safety. All equipment and procedures shall conform to OSHA, NEMA, ABA and ANSI Standards and conform to the Standard Building Code and the Standard Mechanical Code. All installations for the Durham VAMC shall conform to all applicable VARR and FAR. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from facility Safety Manager at least 24 hours in advance. New work shall be installed and connected to existing work neatly, safely and professionally. Any portion of the VAMC that is disturbed or damaged shall be replaced or repaired to its prior conditions. The contractor is required to notify the COR upon arrival and departure of personnel at the work site every day work is performed during the execution of this project. Government Supplied: The facility record drawings and AutoCAD files are available for the AE s use. NOTE: Not all record drawings are available on AutoCAD. Additionally, it is emphasized that the accuracy of facility record drawings must be field verified by the AE. Prints of any current as-built drawings shall be made available to the AE during any of his site visits if requested. The VA Engineering Department drawing files, large size copier and paper will be made available for use by the AE for this purpose. The project design shall be completed in accordance with this AE scope and all appropriate Department of Veterans Affairs (VA) standards, specifications, and other criteria otherwise required by the VA. The AE shall retrieve all VA design information and standards from the VA Facilities Web Site (Technical Information Library (TIL) - Office of Construction & Facilities Management (va.gov)). These documents and all national, state and local codes adopted and used by the VA shall be incorporated in the design of this project and reflected in the construction cost estimate. The following references, as applicable, shall be utilized for planning and design purposes: VHA Program Guide PG-18-3 VA Master Construction Specifications VA Design Manuals National Electric Code PG-18-13 Barrier Free Design Handbook Life Safety Codes Electrical Design Manual Government-furnished Record Drawings (AE to field verify conditions) PG-18-15 AE Submission Requirements. Required Training All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete the following before being granted access to VA information and its systems: Sign and acknowledge (either manually or electronically) understanding of and responsibilities for compliance with the Contractor Rules of Behavior, Appendix D relating to VA information and information systems. Successfully complete the appropriate VA privacy training and annually complete required privacy training. The contractor shall provide to the contracting officer and/or the COTR a copy of the training certificates and certification of signing the Contractor Rules of Behavior for each applicable employee within 1 week of the initiation of the contract and annually thereafter, as required. Compliance Awareness Training shall be provided to the vendor prior to allowing access to the Durham VA Healthcare System. This may be accomplished through briefing the contractor of their Duty to Report any fraud, waste and abuse witnessed while on VA premises to the Compliance Officer Failure to complete the mandatory annual training and sign the Rules of Behavior annually, within the timeframe required, is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the training and documents are complete. Project Area Prepared by Scott Tenhoff Scott.Tenhoff@va.gov 919.286.0411 x176445 November 14, 2022 END OF STATEMENT OF WORK
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/153a941a2fcf429f8b86d72deb276314/view)
- Record
- SN06772903-F 20230804/230802230042 (samdaily.us)
- Source
-
SAM.gov Link to This Notice