Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 04, 2023 SAM #7920
SOLICITATION NOTICE

N -- Security system services USCG Station Bellingham

Notice Date
8/2/2023 11:01:36 AM
 
Notice Type
Solicitation
 
Contracting Office
BASE SEATTLE(00033) SEATTLE WA 98134 USA
 
ZIP Code
98134
 
Solicitation Number
07252023
 
Response Due
8/2/2023 12:00:00 PM
 
Archive Date
08/17/2023
 
Point of Contact
Amy Morrissette, Phone: 2062176052
 
E-Mail Address
amy.morrissette@uscg.mil
(amy.morrissette@uscg.mil)
 
Description
1.1 Objective The United States Coast Guard (USCG) is procuring an indoor/outdoor security system to include control centers, monitors, cameras, software, hardware, installation, warranty and onsite training for users onboard USCG Station Bellingham and Maintenance Support Building. SITE TOUR: A site tour will be held Friday 28 July at 0930am PST. Meet at the front entrance of USCG Station Bellingham, WA, if interested. For more information contact the project manager: Raymond Anderson at raymond.c.anderson@uscg.mil or phone at (360) 640-8571. This is Lowest Price Technically Acceptable source selection process (FAR 15.101-2). Technial criteria will be as follows: 1. Delivery date. Vendor shall be able to start work with all available goods for a date in August 2023. 2. Work plan. Please provide a 1 to 2 page typed proposal that suggests, at minimum, how you intend to meet the expected tasks (including but not limited the number of people you will have on job site), your technical abilities to meet the overall goals of the project, and how your team plans to ensure quality and resolve discrepancies.� 3. Required reports:�� Required�for Standard ICT Items For�EACH Standard COTS/GOTS ICT item,�REQUIRE the offeror to provide: Accessibility Conformance Report (ACR)�- A written ACR for each ICT item, based on the product�s�Voluntary Product Accessibility Template (�)�. To be considered for award, the ACR must be complete, and submitted according to the instructions. Supplemental Accessibility Report (SAR)�- A written SAR containing: Description of evaluation methods used to produce the ACR, to demonstrate due diligence in supporting conformance claims; Documentation of features that help achieve accessibility and usability for persons with disabilities; Information on core functions that can�t be used by persons with disabilities; Information on how to configure and install the ICT item to support accessibility; and Information on how the ICT item enables the creation of accessible electronic content that conforms to the Revised 508 Standards, including the range of accessible user interface elements the tool can create. (only required for authoring tools that generate content (documents, reports, videos, multimedia, web content, etc.) Answers to questions resulting from tour: There are some cameras on the drawing that are in new locations. This will require a fair bit of conduit work to complete. Is it acceptable to use existing camera locations? I believe that using existing camera locations will provide at least the same level of coverage if not somewhat better�coverage. (new layout drawing can be provided with quote).�The legacy camera layout does not comply with current DHS/USCG security standards. There are some locations where the new cameras will replace legacy ones, but there are several that will be installed in new locations. Deviations from the VSS design provided are not authorized.� There�are cameras currently installed on poles in several locations but there are not new cameras for these locations. Can we use the poles for new camera installation? This would provide exception visibility as well as save time installing additional conduit. (New layout drawing can be provided with quote).�See answer above.� For camera locations that currently have cameras but no cameras are slated to replace them, is the intent to have the existing cameras brought in to the new system? The boat house is a good example of existing cameras that are not listed to be replaced on the camera map provided in the solicitation.�Per the SOW, all legacy hardware will be removed by installer.� Will any type of analytics be required or desired at the facility?�Not at this time.�� PTZ cameras � just to confirm there are 5 PTZ cameras on this solicitation. PTZ cameras will require the user to position the camera manually for recording purposes. My concern is that the PTZ cameras may not be well utilized compared to a lesser expensive multi sensor camera. Just wanting to confirm the functionality.�We've evaluated the options and are requesting PTZ for a specific purpose.�� Accessibility Conformance Report (ACR) and Supplemental Accessibility Report (SAR) � these reports are listed as required but I�ve not seen this before for a video surveillance system. �Are these really required for this system and if so can you provide some additional information as to how to prepare the reports?��I'll defer to the KO on this. I have no clue what an ACR or a SAR is... KO's have had me put that in SOWs before. If it's irrelevant to this project, please remove.� Do all cables in all places need to be enclosed in conduit? (anything more specific regarding where conduit needs to be used) I basically need to know how much conduit we will need to install because that could add a substantial amount of work and makes a large difference in the bid. I could bid as if it was all in conduit but that is not ideal.�Only when not in a designated cable run.� I don�t exactly know how long the runs are? so that also makes that part difficult to bid. The cables leave a little more wiggle room because some extra distance is not a big deal.�The unit is able to support a site survey if needed.�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/185e6d59259048689c1150908228246c/view)
 
Place of Performance
Address: Bellingham, WA 98225, USA
Zip Code: 98225
Country: USA
 
Record
SN06773204-F 20230804/230802230045 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.