SOLICITATION NOTICE

Z -- Oak Bottom Compound Deck Replacement

Notice Date
8/4/2023 7:16:21 AM
 
Notice Type
Solicitation
 
Contracting Office
USDA FOREST SERVICE-SPOC SW Washington DC 20250 USA
 
ZIP Code
20250
 
Solicitation Number
12970223R0031
 
Response Due
8/8/2023 4:00:00 PM
 
Archive Date
08/23/2023
 
Point of Contact
Derek Lavey, John Kamerer
 
E-Mail Address
derek.lavey@usda.gov, john.kamerer@usda.gov
(derek.lavey@usda.gov, john.kamerer@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
ALL RFI'S WILL BE ANSWERED VIA AMENDMENT AND SHOULD BE SUBMITTED VIA EMAIL TO DEREK LAVEY AT DEREK.LAVEY@USDA.GOV NO LATER THAN 7 DAYS PRIOR TO THE CLOSE OF THIS SOLICITATION. Project Oak Bottom Compound Deck Replacement General Information 1.0 Background The decks, porches, railings, and stairs at the Oak Bottom Compound have suffered severe weather damage and dry rot. There are blackberry bushes and other plants and trees that have grown into and through the decks and railings. This has caused the decks, railings, and stairs to be compromised and are unsafe to use. The entryway porches have loose and missing deck boards and stair treads. The decks also have missing planks and some of the planking is too weak to stand on. 2.0 Scope of Work Cut back and de-brush all overgrowth of bushes, berry vines and small trees. Remove all decking, railings, stairs and any compromised framing and foundations of the existing decks and dispose of the debris off forest service property in a legal land fill or recycling facility.� Repair any compromised areas of deck framing and foundations prior to installing the decks, railings, and stairways. Site Visit There will be no pre-bid site tour, however it is strongly advised that the Contractor thoroughly investigate the site to determine the full extent of the work and the quantities of materials needed.� To make an appointment for a site visit contact Jerry McCluskey on the Six Rivers National Forest at (707) 672-3217. Contractor Requirements 3.0 Technical Requirements / Tasks Demolition: Cut back any bushes, vines or small trees that have overgrown into or through the decking. Remove all existing deck flooring, railings, cap rails, balusters, balustrades, treads, risers, and stringers and either recycle or dispose of in a landfill. Inspect all footings, piers, support columns, beams, ledgers, rim joists, joists and bridging for structural integrity and remove anything that does not meet industry standards. Construction: Replace any footings, piers, support columns, beams, ledgers, rim joist, joist and bridging that were removed. Install new deck flooring, railings, cap rails, balusters, balustrades, treads, risers, and stringers. Preferred Materials: ������������� Trex Transcend Composite Decking - Spiced Rum - 1� Square Edge Board (or equal, see specifications for salient characteristics). ������������� Trex Transcend Horizontal Railing (or equal, see specifications for salient characteristics): ���������������������������� Components: Post Sleeve Skirt Post Sleeve Post Sleeve Cap Top Rail Bottom Rail Square Balusters All Necessary Hardware
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/6374277ea1034c9681d88b6f1e309cc0/view)
 
Place of Performance
Address: Somes Bar, CA 95568, USA
Zip Code: 95568
Country: USA
 
Record
SN06777660-F 20230806/230804230054 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.