Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 06, 2023 SAM #7922
SOURCES SOUGHT

Y -- P-1241 Low Altitude Radio Communication System Communication Towers for Marine Air Ground Task Force Training Command, Twentynine Palms, CA

Notice Date
8/4/2023 11:44:21 AM
 
Notice Type
Sources Sought
 
Contracting Office
NAVFAC SOUTHWEST SAN DIEGO CA 92132-0001 USA
 
ZIP Code
92132-0001
 
Solicitation Number
N6247323RCTOW
 
Response Due
8/25/2023 2:00:00 PM
 
Archive Date
09/09/2023
 
Point of Contact
Rachel Jones, Phone: 619-705-4647, Victor Mariscal, Phone: 6197054657
 
E-Mail Address
rachel.m.jones83.civ@us.navy.mil, victor.m.mariscal.civ@us.navy.mil
(rachel.m.jones83.civ@us.navy.mil, victor.m.mariscal.civ@us.navy.mil)
 
Description
P1241 Communication Towers, Marine Corps Base Twentynine Palms Ranges.� MILCON project P1241 constructs new LARCS towers and restores and modernizes existing LARCS towers on remote mountaintops or hilltops accessible only by helicopter and lacking any underground utilities such as electricity, water and sewer.� It provides the installation�s remote mountain range training area with: 1) the design and construction of four (4) new communication towers coordinated with Naval Sea Systems Command (NAVSEA); 2) the design and construction of the renovation or repairs of seven (7) existing communication towers; 3) the installation of NAVSEA-provided intermodal (ISO) freight container (CONEX) serving as communication equipment shelters; 4) the installation of supporting facilities for each tower; and 5) relocation and/or installation of communication components on the new and existing towers.� Special construction challenges include complex construction sequencing and phasing subject to: 1) availability of heavy lift helicopters during the construction period; 2) mandatory work stoppage during the fire season months and high wind conditions; 3) intentional work stoppage coordinated with and subject to changes of range training activities; and 4) continuous operation of training and area coverage by the interlinked existing communications systems for the range training area.� Construction requires coordination with Government system engineers and system integrators during the equipment installation to ensure the uninterrupted communications coverage.� Communication tower design and construction schedule shall be coordinated with NAVSEA�s deployment and migration of the (LARCS and Radio Frequency (RF) network system.� Range area Operation and Maintenance Support Information is included in this project.� Site preparation includes demolition, site clearing, grading, earthwork and contaminated soil disposal without the availability of underground utilities such as electricity, water or sewer.�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/3e77b8cfd3cc41908889ac8170e53cf7/view)
 
Place of Performance
Address: Twentynine Palms, CA, USA
Country: USA
 
Record
SN06778265-F 20230806/230804230058 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.