Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 09, 2023 SAM #7925
SOLICITATION NOTICE

Z -- FY23 Richard B. Russell Tail Race Riprap Revetment Repair

Notice Date
8/7/2023 4:10:16 AM
 
Notice Type
Solicitation
 
Contracting Office
US ARMY ENGINEER DISTRICT SAVANNAH SAVANNAH GA 31401-3604 USA
 
ZIP Code
31401-3604
 
Solicitation Number
W912HN23B5005
 
Response Due
9/6/2023 7:00:00 AM
 
Archive Date
08/06/2024
 
Point of Contact
Arcia Fusi, Phone: 9126525901, Jennifer Ford, Phone: 9126525005
 
E-Mail Address
arcia.e.fusi@usace.army.mil, jennifer.m.ford@usace.army.mil
(arcia.e.fusi@usace.army.mil, jennifer.m.ford@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
This project scope of work involves a design to repair designated areas that are eroded along approximately 1,850 linear feet of bank revetment and 2 stone flow diversion structures extending an additional 400 linear feet on the Georgia side of the Savannah River near the tail race of the Richard B. Russell Dam. The stone revetment will be constructed to tie into the existing up-river and down-river portions of the revetment. Repairs will include the placement of stone over the original footprint of the revetment and diversion structures and grouting of the void underneath the stairs of the diversion structure furthest downstream of the dam. The repaired revetment and diversion structures will consist of armor stone. The diversion structures and bank line revetment will be built to existing sidewalk crest elevations with 2:1 side slopes, in accordance with the original design. The current estimated quantity of rock is 6125 TN. It is anticipated that work will be completed from the water on a barge. Boat ramps are available for use. Upon completion of use of the staging area, all pavement that has been disturbed during the staging process shall be resurfaced. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters. The contractor will be responsible for furnishing, stockpiling, and placement of all rock. The rock will be carefully placed within the template using approved equipment in a manner to produce a well-graded mass of rock and to minimize impacts to fish and wildlife. Additional project requirements include erosion control provisions, earthwork incidental to rock placement, and avoidance of disturbing existing utilities. See Solicitation Documents for further details. Information found on https://www.usace.army.mil/Business-With-Us/Partnering/ is provided to comply with FAR 36.211 (b). Visti�https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN23B5005 to obtain more details.�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/ee3cf348d207419299aa64c201baf945/view)
 
Place of Performance
Address: Elberton, GA 30635, USA
Zip Code: 30635
Country: USA
 
Record
SN06779350-F 20230809/230807230051 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.