SOLICITATION NOTICE
Z -- John Day Dam Turbine Runner Replacement and Generator Rewind Project-100% Review
- Notice Date
- 8/9/2023 9:55:02 AM
- Notice Type
- Presolicitation
- Contracting Office
- US ARMY ENGINEER DISTRICT PORTLAND PORTLAND OR 97204-3495 USA
- ZIP Code
- 97204-3495
- Solicitation Number
- W9127N24R0001
- Response Due
- 8/25/2023 5:00:00 PM
- Archive Date
- 06/28/2024
- Point of Contact
- Carolyn J. Randolph, Aragon Liebzeit
- E-Mail Address
-
carolyn.j.randolph@usace.army.mil, aragon.n.liebzeit@usace.army.mil
(carolyn.j.randolph@usace.army.mil, aragon.n.liebzeit@usace.army.mil)
- Description
- 09 August 2023:� Removed 7 specification files and 1 RFP file and replaced all with 3 specification files.�� General. �This is a PRESOLICITATION NOTICE and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. Notice Details. �The U.S. Army Corps of Engineers (USACE), Northwestern Division, Portland District (NWP) is seeking Industry review and input of the 100% plans and specifications documents. �� The North American Industrial Classification Code (NAICS) for this potential requirement would be 237990, �Other Heavy and Civil Engineering Construction�. �The related size standard is $45M. Project Site Background/Scope.� The purpose of this requirement is to provide a hybrid design, manufacturing, and construction type contract with an estimated magnitude of over $500,000,000 for the turbine runner replacement and generator rehabilitation of up to sixteen turbines and generators and John Day Dam, spanning the Columbia River between Washington and Oregon.� The goals of the project are to address decreasing reliability and efficiency of the hydroelectric generating units and to maximize the net economic benefits over the next several decades, while maintaining an acceptable level of operational flexibility, all within the hydraulic and environmental constraints imposed on the project. Economic benefits will be realized through increasing reliability and efficiency of the hydroelectric generating units after replacing existing turbines with improved fish passage turbines that provide improved power generating efficiency, rewinding the generators, and replacing and refurbishing other powertrain equipment. The design of the state-of-the-art turbines will be an iterative and collaborative process that focuses on improved fish passage design features and criteria to improve survival of turbine-passed fish. Finally, this project will decrease the risk of oil entering the water passageway and river through improved sealing technologies, design considerations for new adjustable-blade turbine runners, and the introduction of some fixed-blade turbine runners. Anticipated period of performance:� Portland District anticipates soliciting the requirement in June 2024. The contract will include three main stages of performance: design, manufacture/fabrication, installation/on-site work. These stages will begin in approximately 2025 for a period which could exceed fifteen years. Acquisition Strategy Method.� Portland District intends to award a Fixed-Price Contract with Economic Price Adjustment (EPA).� Communications for Industry.� Portland District is interested in feedback from interested firms capable of performing as a prime contractor on the requirement.� To protect the confidentiality of our industry partners, while encouraging candid and open discussions, the requirement for firms to upload their feedback in ProjNet is not required.� Upon solicitation issuance, all comments or inquiries shall be submitted in ProjNet without exception.� � Contractors� responses shall be limited to 10 pages and shall include the following information: Firm's name, address, point of contact, phone number, e-mail address, CAGE code or UEI, and Construction Bonding Level. A summary of any projects the contractor has performed and deems of similar complexity and with similar features and scope (over $500M) within the past 12 years. The firm�s interest in proposing on the requirement, should it be solicited. Comments, concerns, or suggestions the firm has which may influence the solicitation documents.� � POCs:� Aragon.N.Liebzeit@usace.army.mil and Carolyn.J.Randolph@usace.army.mil RESPONSE DUE DATE/TIME: All responses are due to both POCs, via email on or before 5:00 P.M. PDT on 25 August 2023.� *PLEASE NOTE:� The Government will use information for its own purposes and in making decisions concerning development of the solicitation, but no responses will be released publicly. As this is a Review only, the Government does not�maintain that all applicable clauses are included.� Disclaimer.� This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Presolicitation Notice or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's capabilities to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/1ce6369b5b9f43f3b5c6fc3eb4d6bbda/view)
- Place of Performance
- Address: Rufus, OR 97050, USA
- Zip Code: 97050
- Country: USA
- Zip Code: 97050
- Record
- SN06783171-F 20230811/230809230050 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)