Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 12, 2023 SAM #7928
SPECIAL NOTICE

C -- Nurse Call Replacement Facility Wide

Notice Date
8/10/2023 7:55:31 AM
 
Notice Type
Special Notice
 
NAICS
541330 — Engineering Services
 
Contracting Office
246-NETWORK CONTRACTING OFFICE 6 (36C246) HAMPTON VA 23667 USA
 
ZIP Code
23667
 
Solicitation Number
36C24623R0005
 
Response Due
1/3/2023 5:00:00 AM
 
Archive Date
08/28/2023
 
Point of Contact
Nicholas J. Ruppert, Contracting Officer, Phone: 757-726-6084
 
E-Mail Address
Nicholas.Ruppert@va.gov
(Nicholas.Ruppert@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Awardee
null
 
Description
DESCRIPTION: This is a Special Notice for the establishment of an Architect-Engineering (A-E) contract with services to be performed at the Hampton VA Medical Center at 100 Emancipation Drive, Hampton, VA 23667. This requirement is being executed under a 100% Set-Aside to Service-Disabled Veteran Owned Small Business (SDVOSB) firms. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL; NO SOLICITATION PACKAGE WILL BE ISSUED UNTIL AFTER AN EVALUATION HAS BEEN MADE ON THE PROVIDED SF-330s. The SF-330 can be downloaded through the GSA Forms Library at: http://www.gsa.gov/portal/forms/type/TOP, scroll down to locate and click on the SF-330 hyperlink entitled, Architect-Engineer Qualifications. Interested firms should submit their current SF-330, Parts I and II, to Nicholas.Ruppert@va.gov. The SF-330s are due no later than 8:00 AM, EST, January 3, 2023. SCOPE OF WORK: This project requires the services of an architectural engineering firm (AE) having special knowledge of hospital design. The AE must have experience with Architectural, Environmental, and Electrical Engineering with regards to replacing the Nurse Call System Facility Wide. Intent This project is intended for the design for the removal and replacement of the facility wide Nurse call system at the Hampton VAMC, Hampton, VA. A/E will investigate the existing conditions of the existing site. The project shall replace the entire Nurse Call system throughout the facility, to include pull stations, monitoring systems and servers. The project shall include all patient care areas in the following buildings: 13, 14, 17, 148, 148T, 146, 144, 138, 138A, 137, 116, 114, 113, 110, 110A, 110B, 110C, 83, 66 and 43. Requirements (See Attached Statement of Work for Full Details) The AE selected is expected to: Part Ia Preparation of Existing Conditions and Conceptual Design Investigative Services: Preparation of existing conditions plan and conceptual design which includes site investigation for architectural, electrical, and environmental hazards, such as suspect ACM, other hazardous materials. Work will consist of A/E personnel crawling in crawlspaces, removing ceiling tile and tracing ductwork above ceilings, and tracing ductwork in the building penthouse. Perform project site investigation in accordance with the Site Investigations section of the Scope of Work. Physically survey as well as review record drawings of the existing building. Inform CO/COR of supplemental information gathering that may be required. Perform Photographic Documentation during Investigative Services; files are to be maintained for future reference of existing conditions for construction documents and unforeseen unit costing basis. The Contractor shall prepare digital photo documentation of construction work, including sites, buildings, and field activities. Digital photos shall be consolidated into a project report submitted in JPEG format to the Contracting Officer and COR, and to a resolution sufficient and appropriate for the type of work photographed. The Contractor shall provide an index for each set of photographs submitted identifying the contractor, base, facility, project number, date, and a brief description. The Contractor shall coordinate photography of any kind through the COR. Part Ib Preparation of Contract Drawings and Specifications Submit complete review package in accordance with the following requirements and guidelines outlined in https://www.cfm.va.gov/til/aeDesSubReq.asp Please pay specific attention to the design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E may elect to delete individual submissions where not required (i.e. Do not address A. Site Development, Landscaping for interior renovation projects) DELIVER: Design Development 30%: Identify all design calculations. Identify all existing utilities and utilities requirements. Utilize all applicable VA Design Checklists. Design Development 50%: Address all comments from the 30% Submission review. Utilize all applicable VA Design Checklists. Design Development 95%: Address all comments from the 50% Submission review. Design all finishes Finalize required submittals. Utilize all applicable VA Design Checklists. Contract Documents (Bid documents): Submit a complete document of all contract requirements. The Cover Page shall be submitted for approval signatures. If necessary, update and submit until approved by the VA. Consolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process Part II - Construction Period Services: Review and provide concise recommendations on all submittals, shop drawings, product data, samples, RFI s (Questions & Clarification Requests), change order proposals, etc. in accordance with Construction Period Services section of this statement of work. Services shall include third party asbestos monitoring, if needed, that will be performed during construction by a VA Certified Asbestos Air Sampler. Services shall include providing record drawings based on finalized contractor red-line as-builts. Assist in answering questions and provide clarifications as deemed necessary by the Contracting Officer or COR during solicitation and issuing any addendums, revise drawings/Specifications, etc. necessary to address questions fully and completely any and all questions submitted by the COR, Contracting Officer and awarded Construction Contractor. Assist the VA to determine whether the contractor or subcontractor meets qualification requirements, support by written recommendations of any problems or litigation encountered in past based on firsthand knowledge. Review all submittals and provide recommendations to the VA within fourteen (14) calendar days upon request. Review and provide replies to contractor generated RFIs when required by the project manager within seven (7) calendar days. Review contractor's cost estimates and provide recommendations to the VA. Make site visits on requests of the VA and prepare written reports to include agreed upon changes in design as determined necessary during the construction. Visits made based on errors and omissions in design will be at no cost to the VA. Participate in partial/final acceptance inspections as scheduled and generate punch list items for completion. The punch list shall reference the contract documents for specific deficiencies (i.e. specification section, drawing detail, etc.) Prepare as-built drawings on original set with A/E s stamp, based on record drawings that the contractor kept during construction. Transpose contractor s as-builts to AutoCAD (.dwg) and provide a set of updated as-builts on CD within 30 days to the Project Engineer. Final drawing submittal will include hard copies as described for other submissions as well as a CD clearly labeled with the project name, number and submittal date containing: Folder labeled bid documents All specifications bound in 1 word document (make sure spec sections are separated by page breaks) All drawing sheets in one .pdf file. Folder labeled DWG s with subfolders containing engineering disciplines (Architectural, MEP, Structural, Civil, etc.) which includes the .arj file (for every discipline) to launch and organize the drawing file system and make all drawings the current project inside of AutoCAD. Folder labeled PDF sheets containing separate .pdf documents for each discipline. Folder labeled cost estimate containing a copy of the final construction cost estimate documents Folder labeled calculations containing final calculation documents. Folder labeled specifications with a word document for each spec section Folder labeled misc for IH reports, materials testing, VPDES permit, soils tests, sustainability checklist, etc. Upon construction completion, red line drawings will be furnished to the A/E to prepare as built drawings. Final as built drawings will be furnished as master building drawings in a project manager format prescribed by the VA. The A/E shall review and approve all specified equipment and installation submittals and shop drawings. The A/E shall attend the pre-construction conference to review and confirm project scope. During construction, the A/E shall allow for a minimum of 6 site visits as directed and scheduled by the COR. Part III Construction Period Site Visits: Visit the site at the request of the VA in accordance with section Site Visits in the scope of work. The total number of site visits during the construction period is estimated to be a minimum of 6 for this project, which may be finalized after selection of the AE and during negotiation of the proposal. Each site visit shall be documented through a field report denoting the purpose and results of the site visit. Make site visits on requests of the VA and prepare documented field reports denoting the purpose and results of the site visit, to include agreed upon changes in design as determined necessary during the construction. Visits made based on errors and omissions in design will be at no cost to the VA. Participate in partial/final acceptance inspections (in-wall, above ceiling, and final) as scheduled and generate punch list items for completion. Inspections shall cover quality of installations and locations/placement of items in accordance with the contract documents. The punch list shall reference the contract documents for specific deficiencies (i.e. specification section, drawing detail, etc.). Attend the pre-bid and pre-construction conference to review and confirm project scope. During construction, allow for a minimum of site visits as negotiated for the contract, as directed and scheduled by the COR. OFFERORS WILL BE EVALUATED ON THE FOLLOWING CRITERIA: The submitted SF-330s shall be a maximum of 45 pages (not to include CPARS and PPQs). All necessary information to meet the 8 criterions shall be contained within those 45 pages. The submitted SF-330s will be evaluated on the following criteria: The selection criteria are listed in order of importance. This acquisition will be in accordance with FAR Part 36.602-1 and VAAM Part M836.602-1(See Attached document). The A/E must demonstrate its qualifications with respect to the published evaluation criteria for all services. The Department of Veterans Affairs shall evaluate each potential contractor in terms of the following M firm meeting the selection criterion and NM means that the firm did not meet the selection criterion. (1) Professional qualifications necessary for satisfactory performance of required services; (2) Specialized experience and technical competence in the type of work required, specifically Nurse Call/Notification Systems and architectural requirements. (3) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules in a hospital setting. (4) Capacity to accomplish the work in the required time for both the prime and subconsultants. (5) Construction Period Services (6) Record of significant claims against the firm (7) Utilization of SDVOSB firms. (8) Location (tiebreaker) Criterion 1 -Professional qualifications necessary for satisfactory performance of required services showing recent experience of the project team with comparable hospital projects within the past five years in which the construction has been completed. Offerors will be evaluated in terms of the qualifications, competence and experience of the key personnel and technical team proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide a balanced, licensed, and or certified workforce in the following disciplines Architectural, Environmental, and Electrical. Submission requirements: Provide resumes for all proposed key personnel. Resumes are limited to one page each and should cite project specific experience and indicate proposed role in this contract. Provide professional registration, certification, licensure and/or accreditation. Indicate participation of key personnel in example projects in the SF-330 Part 1 Section G. Each resume shall include a minimum of two (2) specific completed projects through construction. Firm shall provide a table of a minimum of 5 comparable projects comparing their IGE with the bid/award amount during construction. Evaluator Consideration: Do the qualifications indicate that the project team has recent direct experience on Hospital projects designing similar improvements to those proposed at Hampton VAMC? Is the architect/engineer providing a team where each member has more than 5 years of experience? What will be the role of interns if used during design? Criterion 2 - Specialized experience and technical competence in the type of work required, including, where appropriate, experience specifically Nurse Call/Notification Systems. Offerors will be evaluated on specialized experience and technical competence in the performance of services like those anticipated under this contract about: Special knowledge of Nurse Call/Notification Systems design in Medical Facilities Experience working in and around an operational Hospital Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team.  Submission requirements: Provide up to one (1) not to exceed five (5) projects completed or substantially completed within the past five (5) years that best illustrate specialized experience of the proposed team in the areas outlined above. Example projects shall note project s square footage. All projects provided in the SF-330 must be completed by the office/branch/regional office/individual team member proposed to manage and/or perform work under this contract. To enable verification, firms should include the DUNS number along with each firm name in the SF-330 Part 1, Section F Item 25 Firms from Section C Involved in this Project, block (1). Include a contract number or project identification number in block 21. Include an e-mail address and phone number for the point of contact in block 23(c). Include in the project description, the contract period of performance, award contract value, current contract value, and summary of the work performed that demonstrates relevance to specialized experience as outlined above. If the contractor served as a subcontractor on a project, indicate the value of the work they provided towards the performance of the overall project. If a project was performed by a joint venture, and not all joint venture partners are on the team proposed for this contract, the offeror/team should specifically address the work performed by the joint venture partner offering/teaming on this contract. Likewise, if the offeror/team member worked as a subcontractor on a project, the description should clearly describe the work performed by the offeror/team member and the roles and responsibilities of each on the project, rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration. Additionally, Firms are required to return and submit the Attachment B titled Criterion 2 Format, which will clearly demonstrate specific experiences and qualifications of personnel proposed for assignment to the project and their record of working together as a team. Specifically list similar scoped projects covering the previous 10 years and clearly show participation. (See SF330 Part I Section G, but not excluding other information provided on the SF330 and supporting documentation.) NOTE: If the Offeror is a joint venture, information should be submitted as a joint venture; however, if there is no information for the joint venture, information should be submitted for either joint venture partner, not to exceed a total of five (5) projects for this criterion. Projects shall be submitted on the SF-330. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not list an IDIQ contract as an example of a completed project. Instead, list relevant completed task orders or stand-alone contract awards that fit within the definition above. Examples of project work submitted that do not conform to this requirement will not be evaluated. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. All information for Criterion 2 should be submitted in Part 1, Section F of the SF-330. The Government WILL NOT consider information submitted in addition to Part 2, Section F in evaluating Criterion 2. Evaluator Consideration: Does the architect/engineer provide evidence of understanding of the project; and any unique architectural/engineering aspects associated with the proposed project and how to address them? Criterion 3 Past Performance 3. Offerors will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS/ACASS for Criterion 1 projects and may include other information provided by the firm, customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. NOTE: Past performance information for projects listed under Criterion 1. Project Recency: A project will be considered recent only if performance was completed within five (5) years of the date of issuance of this public announcement. Ongoing projects will not be considered as no accurate performance record can exist for work not yet completed. Submission requirements: SUBMIT A COMPLETED CPARS/ACASS EVALUATION FOR EACH PROJECT UNDER CRITERION 1. IF THERE IS NOT A COMPLETED CPARS/ACASS EVALUATION, the Past Performance Questionnaire (PPQ) included in this notice is provided for the offeror or its team members to submit to the client for each project the offeror includes under Criterion 1. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS/ACASS IS AVAILABLE. IF A CPARS/ACASS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Submit no less than three (3) and no more than five (5) past performance references for recent and relevant projects identified on SF330 Part I Section F. Completed PPQs should be submitted with your SF-330. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before the response date set forth in this notice, offerors should complete and submit with their responses the first page of the PPQ (Attachment A), which will provide contract and client information for the respective project(s). Offerors may submit a PPQ previously submitted under a different Notice/RFP (legible copies are acceptable) if it is on the same form as posted with this Synopsis. Offerors should follow up with clients/references to ensure timely submittal of questionnaires. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, Network Contracting Office 6, Attn: Nicholas J. Ruppert via email at Nicholas.Ruppert@va.gov prior to the response date. Offerors shall not incorporate by reference into their response PPQs or CPARS previously submitted in response to other A/E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Evaluator Consideration: Does the proposed architect/engineer have past performance with ratings satisfactory and above while working on hospital projects? Does the architect/engineer have a reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. Criterion 4 - Capacity to accomplish the work in the required time for both the prime and subconsultants. This factor evaluates the ability of the firm, given their current projected workload (percentage) and the availability of their key personnel, to accomplish the possible myriad of design projects in the required time. The general workload and staffing capacity of the design office will be evaluated. Submission requirements: I. List current projects with a design fee of greater than $50,000 being designed in the firms office. II. Indicate the firms present workload and the availability of the project team (including sub-consultants) for the specified contract performance period. III. Describe experience in successfully delivering projects per performance schedule, providing timely construction support, and successfully completing multiple projects with similar delivery dates IV. Volume of VA contract awards in the last 12 months. Criterion 5 Construction Period Services. Offerors will be evaluated on the quality of the construction period services provided. Construction period services include but are not limited to (See Statement of Work) professional field inspections review of construction submittals support in answering request for information, and support of construction contract changes. Submission Requirements: Provide up to three (3) completed projects in the past ten (10) years that best illustrates the construction period services performed by the team. Describe construction period services provided and whether the project was completed within schedule and budget. Include a contract number or project identification, include name, telephone number, and email of the completed project stakeholder. Criterion 6 - Record of significant claims against the firm because of improper or incomplete architectural and engineering services. Submission Requirements: Indicate any claims against the firm because of improper or incomplete architectural and engineering services within the past five (5) years. Criterion 7 Utilization of SDVOSB firms. Offerors will be evaluated on the extent to which potential contractors identify and commit to the use of service-disabled Veteran-owned small businesses, Veteran-owned small businesses, and other types of small businesses as subcontractors. Submission Requirements: Provide a list of subcontractors and their socioeconomic categories (SDVOSB, VOSB, and Multiple categories of small businesses). Criterion 8 Location. In the event that evaluations of SF330 s result in the same rating, proximity to the facility will be used as a tiebreaker. The distance will be determined according to http://maps.google.com/. For firms that have multiple/regional offices, the location of the primary project team will be used to calculate the distance and should be provided in the SF330. Submission requirements: Indicate firms/teams location, including main offices, branch offices and any sub consultants offices and demonstrate how this will be advantageous to the Government. SELECTION PROCESS: The agency has convened an evaluation board for the evaluation of responses to this notice. Responses will be evaluated in accordance with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implemented in Federal Acquisition Regulation (FAR) 36.6. Specifically, SF 330 submissions will be evaluated to identify the most highly qualified firms, using the selection criteria identified above. Discussions will be held with at least three (3) of the most highly qualified firms. Interviews may be conducted. The processes at FAR 36.602-4 and FAR 36.606 will then be followed. SELECTION INTERVIEW: Interviews shall be scheduled with firms slated as the most highly qualified. Firms slated for interviews will be asked a series of established questions. Elaborate presentations are not desired. GENERAL INFORMATION: All design and work will conform to the current edition of the VA Master Specifications and VA Design Standards as published at the following site: www.cfm.va.gov; ASME, OSHA, IBC 2009, NFPA and NEC building codes and standards. Coordinate all work through the COR of Facilities Management Service. Contractor is responsible for all cleanups and refuse disposal throughout the construction period. The A-E firm will prepare drawings and specifications in enough detail such that qualified outside General Contracting companies can prepare accurate and timely proposals for the desired construction work. Microsoft Project scheduling and management software will be used by both the A-E and Contractors to allow for regular tracking of schedules and work by the VA Medical Center. Schedules with MS Project will be regularly sent to the COR upon project initiation and whenever significant changes occur in the schedule. The estimated magnitude of construction is between $500,000 and $1,000,000. The A-E will provide an initial estimate of cost to perform the above work and will design only those items that can be provided within the cost limitation. The Estimated Cost of Construction (ECC) shall only be provided to the Contractor in which a formal proposal is sought for the purposes of providing a proposal. The Medical Center must remain operational throughout the construction period and a detailed sequence of work will be provided by the A-E to minimize impact of the construction. The A-E will provide documents at each submission as indicated in the statement of work. The NAICS code for this procurement will be 541330, Engineering Services. The current small business size standard for 541330 is $22.5 Million. DESIGN COSTS: All offerors are advised that in accordance with VAAR 836.606-71 the total cost of the architect or engineer services contracted for the production and delivery of designs, plans, and specifications shall not exceed six percent (6%) of the estimated cost of the construction project plus any fees for related services and activities. Additionally, FAR 52.236-22 Design Within Funding Limitations, will be applicable to this procurement action. Design limitation costs will be provided to the most highly rated A-E firm(s) selected in accordance with the outlined process. LIMITATIONS ON SUBCONTRACTING: In accordance with VAAR 852.219-73, VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside and 13 CFR 125.6, a service disabled veteran-owned small business concern (SDVOSB) agrees that, in the performance of the contract, it will not pay more than 50% of the amount paid by the government to firms that are not similarly situated. Firms that are similarly situated are those that are also CVE-registered SDVOSBs. Requirement for Electronic Submission Unless paper offers are specifically authorized, all responses to this special notice must be submitted electronically as described below.  The only acceptable paper form for this requirement is the receipt of past performance questionnaires. Failure to comply with this requirement may jeopardize the possibility of receiving an award for the contract due to non-compliance with the terms of the solicitation.  You must submit your electronic offer, and any supplemental information (such as spreadsheets, backup data, technical information), using any of the electronic formats and media described below. In addition, contractors are notified of the award via an electronic Notice of Award e-mail.  The award document will be attached to the Notice of Award e-mail. Acceptable Electronic Formats (Software) for Submission of Offers Files readable using the current Microsoft* Office version Products: Word, Excel, PowerPoint, or Access.  Spreadsheet documents must be sent in a format that includes all formulas, macro, and format information.  Print or scan images of spreadsheets are not acceptable.   Please see security note below for caution regarding use of macros. When submitting construction drawings contractors are required to submit one set in AutoCAD and one set in Adobe PDF. (Purpose: contracting can open the PDF version and engineering can open AutoCAD files) Files in Adobe* PDF (Portable Document Format) Files:  When scanning documents scanner resolution should be set to 200 dots per inch, or greater. Another electronic format.   If you wish to submit an offer using another format than those described in these instructions, e-mail the Contracting Officer/Specialist who issued the solicitation. Please submit your request at least five (5) calendar days before the scheduled closing date of the solicitation.   Request a decision as to the format acceptability and make sure you receive approval of the alternate format before using it to send your offer. Please note that we can no longer accept .zip files due to increasing security concerns. E-mail Submission Procedures: For simplicity in this guidance, all submissions in response to a solicitation will be referred to as offers. Subject Line:  Include the solicitation number, name of company, and closing date of solicitation.    Size:  Maximum size of the e-mail message shall not exceed ten (10) megabytes. The SF330, in its entirety, shall not exceed one email of 5MB. The SF330 (not including past performance questionnaires) are limited to 45 pages. If the page limits are exceeded, the pages in excess of the limit will not be read nor considered. Only one email is permitted unless otherwise stated in this paragraph or in writing by the Contract Officer submitting the solicitation. Due to VA IT Security protocols, email submissions are limited to 10Mb per email. Furthermore, it is the sole responsibilityof the prospective firms to confirm receipt of their submission in its entirety prior to the closing date & time of their submission in response to this synopsis. The Microsoft Outlook © Email time/date stamp will be used to date and time stamp offers for the official record of receipt for the submission. The date and time stamp in recipients inbox is the official record of receipt. Security Issues, Late Bids, Unreadable Offers Late submission of offers is outlined at FAR Parts 52.212-1(f), 52.214-7, and 52.215-1(c)(3).  Attention is warranted to the portion of the provision that relates to the timing of submission.    Please see FAR 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers.   To avoid rejection of an offer, vendors must make every effort to ensure their electronic submission is virus-free.  Submissions or portions thereof submitted and which the automatic system detects the presence of a virus or which are otherwise unreadable will be treated as unreadable pursuant to FAR Parts 14.406 and FAR 15.207(c ). The virus scanning software used by our e-mail systems cannot always distinguish a macro from a virus. Therefore, sending a macro embedded in an e-mail message or an e-mail attachment may cause the e-mail offer to be quarantined. You may send both the spreadsheet and the spreadsheet saved in PDF format to ensure that your proposal is readable. Password protecting your submission is not permitted. The Contracting Officer will file the offer electronically which will allow access only by designated individuals. Important Notice: Apparent successful offerors must apply for and receive verification from the Department of Veterans Affairs Center for Verification and Evaluation (CVE) in accordance with 38 CFR Part 74 and VAAR 819.70 by submission of documentation of Veteran status, ownership and control enough to establish appropriate status, offerors must be both VISIBLE and VERIFIED by the...
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/72e78672b9374261a7eb63dcb6279292/view)
 
Record
SN06784678-F 20230812/230810230048 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.