Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 12, 2023 SAM #7928
SOLICITATION NOTICE

45 -- Repair of Damaged Wash Rack Pipe at Air Station Sacramento

Notice Date
8/10/2023 7:46:29 PM
 
Notice Type
Combined Synopsis/Solicitation
 
Contracting Office
DOL-9 NORFOLK VA 23510 USA
 
ZIP Code
23510
 
Solicitation Number
20290QDL952300156
 
Response Due
8/14/2023 7:00:00 AM
 
Archive Date
08/29/2023
 
Point of Contact
LAUREN S. SUCHY, Phone: 7576284120, Fax: 7576284135
 
E-Mail Address
LAUREN.S.SUCHY@USCG.MIL
(LAUREN.S.SUCHY@USCG.MIL)
 
Description
Provide all labor, equipment, and materials to complete the site excavation and repairs to damaged piping to include: Mobilize manpower and equipment to complete the project in a professional and timely manner complying with all local, state, and federal regulations adhering to OSHA guidelines where applicable. Install barriers/engineering controls to isolate the work area: Cones, caution tape, signage, etc. as needed during cleanup activities and maintain as needed. Identify and verify that all utilities wet and dry have been abandoned, locked out and tagged out as necessary prior to clean up. Supply personal protective equipment (hard hats, goggles, gloves, fall protection, safety vest, etc.) for certified supervisor and cross trained and certified employees throughout the duration of the project. Load all waste materials for proper disposal and packaged properly according to state and federal regulations. Leave each work clean and free of debris as feasible and safe at the end of each shift. Proposal to include all labor, supplies, etc. necessary to complete the project. Set up negative air containment. Install 6 mil poly sheeting at all entrances. Remove and dispose of ACM and non-ACM drywall due to black water flooding throughout the basement. Bag up contaminated ceiling tiles on the floor caused by flooding and dispose of. Remove and properly disposal extra drywall at areas that have visual mold on outside surface where occurs. HEPA vacuum, scrub, wet wipe, and sanitize basement floor using a sanitization mixture to clean existing contaminants due to black water flooding. Includes cleaning of bottom frame track after drywall remove. Services shall be accomplished between the hours of 0800-1400, Monday-Friday, not to include federal holidays except as designated by the contracting officer or official representative. The Contractor shall coordinate with the technical POC to schedule a date and time for project commencement. Project is to be completed within 07 days of the contract being awarded. ����� The government shall use a 100% surveillance method. Inspection of work shall be performed at the time the Contractor is at the site performing its services and prior to contractor leaving the site. The Contractor shall remove all debris, rubbish and hazardous waste from the job site. The Contractor shall keep the Contracting Officer and /or technical POC fully informed on the daily progress of the work, from the start through completion of this inspection. The Contractor shall be prepared to increase scope of work if issue is determined to be more extensive than originally expected. Unsatisfactory performance shall result in work being re-accomplished at no cost to the government. It is the contractor�s responsibility to verify all measurements/dimensions listed above prior to submitting a quote/proposal.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/3b757d306f4c405c94b005a58ac57a72/view)
 
Place of Performance
Address: Sacramento, CA, USA
Country: USA
 
Record
SN06785566-F 20230812/230810230055 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.