Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 18, 2023 SAM #7934
SOLICITATION NOTICE

J -- Loyalhanna Lake Gantry Cranes Rehabilitation Saltsburg, Westmoreland County, Pennsylvania

Notice Date
8/16/2023 11:29:53 AM
 
Notice Type
Solicitation
 
Contracting Office
US ARMY ENGINEER DISTRICT PITTSBURG PITTSBURGH PA 15222-4198 USA
 
ZIP Code
15222-4198
 
Solicitation Number
W911WN23B8009
 
Response Due
9/8/2023 8:00:00 AM
 
Archive Date
12/31/2023
 
Point of Contact
CONNIE FERGUSON, Phone: 4123957551, Janie RONEY, Phone: 412-395-7474
 
E-Mail Address
connie.l.ferguson@usace.army.mil, janie.l.roney@usace.army.mil
(connie.l.ferguson@usace.army.mil, janie.l.roney@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
Loyalhanna Lake Gantry Cranes Rehabilitation Saltsburg, Westmoreland County, Pennsylvania. The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the rehabilitation of the of two 64 Ton Gantry Cranes at Loyalhanna Dam Road, Saltsburg, PA. The Requirement is generally for the removal of existing paint and repainting, replacing the cranes electrical distribution and control equipment, mechanical components, and cab modifications. The major features of the requirements are identified below: The Requirement specifically includes: a. Abating (lead-based paint) and repainting the interior and exterior of the cabs and Gantry Cranes surfaces; b. Abating (asbestos) and replacing the floor panels; c. Removing and replacing the interior wall and ceiling finishes and associated framing; d. Remove and replace all controls for the Gantry Crane; e. Remove and replace all existing power distribution equipment and interior raceways; f. Removal of all existing equipment (control station boxes and switches, interior conduit, cabling, main breaker, transformer, generator, etc.)g. Removing and replacing existing wire rope on the Gantry Cranes and Jib Crane hoists; h. Removing and replacing existing brakes for the lift beams, gantry hoists, Jib Crane hoists, and gantry traversal wheels. i. Provide and install operational cameras to monitor the live operation of the Gantry Cranes .j. Provide and install HVAC unit in the operational cabs. Disposal of electrical equipment will be required. Hazardous materials will be disposed of in accordance with all federal, state and local regulations. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable. Construction work will be completed in two phases. Phase one will be the Base Contract which is to rehab Gantry Crane No. 2. Phase two will be the Option Package which is to rehab Gantry Crane No. 1. Gantry Crane No. 2 must be completed, tested, and fully operational before work on Gantry Crane No. 1 can begin, presuming the Option will be exercised. One Gantry Crane must remain operational for potential crest gate operation at the dam. The work shall be completed within 365 calendar days after written Notice to Proceed. *** NOTICE *** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here. SITE VIST HELD 8/16/2023
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/ec7f4872b07f4f2ca848ed55b7d2b5ad/view)
 
Record
SN06792664-F 20230818/230817085738 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.