Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 18, 2023 SAM #7934
SOLICITATION NOTICE

Y -- Maintenance Dredging of the Federal Navigation Project (FNP) at the Portsmouth Harbor and Piscataqua River in Newington, New Hampshire and Elliot, Maine

Notice Date
8/16/2023 9:46:11 AM
 
Notice Type
Solicitation
 
Contracting Office
W2SD ENDIST NEW ENGLAND CONCORD MA 01742-2751 USA
 
ZIP Code
01742-2751
 
Solicitation Number
W912WJ23B0017
 
Response Due
9/18/2023 10:00:00 AM
 
Archive Date
08/15/2024
 
Point of Contact
BRIAN MANNION, Phone: 9783188478
 
E-Mail Address
brian.t.mannion@usace.army.mil
(brian.t.mannion@usace.army.mil)
 
Awardee
null
 
Description
The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids (IFB) for dredging of the Federal Navigation Project (FNP) at the Portsmouth Harbor and Piscataqua River in Newington, New Hampshire and Elliot, Maine. This will be an unrestricted invitation for bid (IFB) requiring a hydraulic hopper dredge to perform the dredging work. The NAICS code for this procurement is 237990 with a size standard of $37M. The estimated construction cost is expected to range from $1,000,000 - $5,000,000. This project has a hopper dredge only requirement and consists of maintenance dredging and advance maintenance dredging to remove approximately 40,000 cubic yards (cy) of clean sand and gravel from areas in the authorized, 35 foot deep by 400 foot wide, main-ship channel in the Newington Reach of the Portsmouth Harbor and Piscataqua River FNP. Dredging in the channel will be to a maximum elevation of -40? Mean Lower Low Water (MLLW) and remove approximately 40,000 cubic yards of sand and gravel. The dredged material will be hauled and placed at the previously used in-river placement site, just downstream from the dredging areas. The dredging and dredged material placement work is expected to take 4-6 weeks to complete. The available work window for the dredging and placement of dredged material is from 1 December 2023 to 15 March 2024.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/6cf95394a592410e89aa96bf9e93c8a1/view)
 
Record
SN06792937-F 20230818/230817085743 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.