Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 18, 2023 SAM #7934
SOLICITATION NOTICE

56 -- Buzzard Creek Fence Realignment - GMUG National Forest

Notice Date
8/16/2023 3:27:09 PM
 
Notice Type
Solicitation
 
Contracting Office
White River National Forest GLENWOOD SPRINGS CO 81601 USA
 
ZIP Code
81601
 
Solicitation Number
1240LT23Q0122
 
Response Due
9/4/2023 4:00:00 PM
 
Archive Date
09/19/2023
 
Point of Contact
Lonnie D Root, Contracting Officer, Justin Bennett
 
E-Mail Address
lonnie.root@usda.gov, justin.c.bennett@usda.gov
(lonnie.root@usda.gov, justin.c.bennett@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Buzzard Creek Fence Realignment Grand Valley Ranger District - GMUG National Forest PoP: 10 days after Notice to Proceed with project extending into the 2024 Season if needed Fence Removal Furnish all supervision, equipment, tools, parts, labor, transportation, lodging, and miscellaneous items for rangeland fence removal. 2.3 miles of existing laydown fence material will be removed; including all posts, wire, braces and stays. All post holes will be filled with existing overburdened soil material. The removed material will be evaluated for condition. Any reusable material will be transported, by the contractor, to the Hightower Guard Station specified in the Buzzard Creek Fence Realignment Planning Map. Any un-useable material will be transported, by the contractor, to be disposed or recycled.� � Fence Construction� Furnish all supervision, materials, equipment, tools, parts, labor, transportation, lodging, and miscellaneous items for rangeland fence construction. �The bulk of the work will include the construction of 1.3 miles of wood post and wire laydown fence. The fence construction will require the placement of 8 ft wire gates every 1/4 mile of straight fence line as well as every corner section fence as identified in the Buzzard Creek Fence Realignment Planning Map. This map also indicates the location of the fence being required Fence construction and gate specifications are attached Constructing a laydown fence. Clearing and pruning of vegetation along fence construction lines will be required within 5 ft of both sides. ��
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/271b73b5b75841c08e173b2dca4db22b/view)
 
Place of Performance
Address: Grand Junction, CO 81501, USA
Zip Code: 81501
Country: USA
 
Record
SN06793398-F 20230818/230817085751 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.