SOLICITATION NOTICE

Y -- 561A4-18-101 Replace Central Chillers

Notice Date
8/17/2023 11:55:21 AM
 
Notice Type
Combined Synopsis/Solicitation
 
Contracting Office
242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
 
ZIP Code
12208
 
Solicitation Number
36C24223B0035
 
Response Due
8/30/2023 7:45:00 AM
 
Archive Date
11/28/2023
 
Point of Contact
Contracting Officer, Victoria Clark, Phone: 585-393-8228
 
E-Mail Address
victoria.clark6@va.gov
(victoria.clark6@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Awardee
null
 
Description
Additional RFI Follow Ups: 1. Clarification to RFI #8c. Since the feeders - GRC conduit and conductors - to be, now, provided by the electrical contractor, we are assuming underground conduit installation between the disconnects (new and the existing ones) and the temporary chillers. a) Should this installation be removed after temp chillers are decommissioned and removed from the site? YES b) if so, can the installation be considered ""temporary"" and maybe surface-mounted utilizing, let's say PVC conduit in lieu of GRC? NO 2. Clarification to RFI #9. It is clearly understood that the conduits in question (related to the HV feeders), are to be installed in GRC conduits. What about the interior conduits as depicted on ES-102? Should they also be installed utilizing GRC conduit? Can EMT be utilized for indoor applications? There is a note on ED-102, related to the WC- feeder to its 5KV starter clearly stating of existing GRC conduit. Please advise: ALL HV FEEDERS TO BE IN GRC CONDUIT 3. Is the work outlined in RFI #46 (the added ATS #2) to be included as part of the contract's ""Base Bid"" or to be priced as a separate add alternate? TO BE PART OF BASE BID The following are also additional updates provided by the AE as an Addendum to the Bidders. On drawings and specification Delete all references to R-134A and Insert R-513A in same location. On Drawing 136-MH-701 - Pump Schedule Circulating Fluid Head (FT): P-4 Revise - Head (FT): from 25 to 60 FT. P-5 Revise - Head (FT): from 35 to 60 FT. P-6 Revise - Head (FT): from 35 to 60 FT. P-7 Revise - Head (FT): from 55 to 92 FT. P-8 Revise - Head (FT): from 50 to 100 FT.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/b85f8872093a461cba29524451332958/view)
 
Place of Performance
Address: 151 Knollcroft Rd Lyons, NJ 07939, USA
Country: USA
 
Record
SN06795065-F 20230819/230817230048 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.