SOLICITATION NOTICE
Y -- 561A4-18-101 Replace Central Chillers
- Notice Date
- 8/17/2023 11:55:21 AM
- Notice Type
- Combined Synopsis/Solicitation
- Contracting Office
- 242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
- ZIP Code
- 12208
- Solicitation Number
- 36C24223B0035
- Response Due
- 8/30/2023 7:45:00 AM
- Archive Date
- 11/28/2023
- Point of Contact
- Contracting Officer, Victoria Clark, Phone: 585-393-8228
- E-Mail Address
-
victoria.clark6@va.gov
(victoria.clark6@va.gov)
- Small Business Set-Aside
- SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Awardee
- null
- Description
- Additional RFI Follow Ups: 1. Clarification to RFI #8c. Since the feeders - GRC conduit and conductors - to be, now, provided by the electrical contractor, we are assuming underground conduit installation between the disconnects (new and the existing ones) and the temporary chillers. a) Should this installation be removed after temp chillers are decommissioned and removed from the site? YES b) if so, can the installation be considered ""temporary"" and maybe surface-mounted utilizing, let's say PVC conduit in lieu of GRC? NO 2. Clarification to RFI #9. It is clearly understood that the conduits in question (related to the HV feeders), are to be installed in GRC conduits. What about the interior conduits as depicted on ES-102? Should they also be installed utilizing GRC conduit? Can EMT be utilized for indoor applications? There is a note on ED-102, related to the WC- feeder to its 5KV starter clearly stating of existing GRC conduit. Please advise: ALL HV FEEDERS TO BE IN GRC CONDUIT 3. Is the work outlined in RFI #46 (the added ATS #2) to be included as part of the contract's ""Base Bid"" or to be priced as a separate add alternate? TO BE PART OF BASE BID The following are also additional updates provided by the AE as an Addendum to the Bidders. On drawings and specification Delete all references to R-134A and Insert R-513A in same location. On Drawing 136-MH-701 - Pump Schedule Circulating Fluid Head (FT): P-4 Revise - Head (FT): from 25 to 60 FT. P-5 Revise - Head (FT): from 35 to 60 FT. P-6 Revise - Head (FT): from 35 to 60 FT. P-7 Revise - Head (FT): from 55 to 92 FT. P-8 Revise - Head (FT): from 50 to 100 FT.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/b85f8872093a461cba29524451332958/view)
- Place of Performance
- Address: 151 Knollcroft Rd Lyons, NJ 07939, USA
- Country: USA
- Country: USA
- Record
- SN06795065-F 20230819/230817230048 (samdaily.us)