SOLICITATION NOTICE
Y -- Power Pole Replacement and Right-of-Way Clearing
- Notice Date
- 8/22/2023 12:29:36 PM
- Notice Type
- Solicitation
- NAICS
- 237130
— Power and Communication Line and Related Structures Construction
- Contracting Office
- US ARMY ENGINEER DISTRICT TULSA TULSA OK 74137-4290 USA
- ZIP Code
- 74137-4290
- Solicitation Number
- W912BV23Q0089
- Response Due
- 9/22/2023 1:00:00 PM
- Archive Date
- 10/06/2023
- Point of Contact
- Clinton Yandell, Phone: 918-669-7559
- E-Mail Address
-
clinton.j.yandell@usace.army.mil
(clinton.j.yandell@usace.army.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Awardee
- null
- Description
- Contractor shall be responsible for providing all supervision, labor, tools, equipment, and other incidental items (unless otherwise noted) necessary for the removal of 15 existing power poles and the purchase and reinstallation/replacement of a total of 15 new power poles, with the appropriate cross arms, insulators ,guywires, and other needed accessories. Extra guy wires will be installed to secure entire electrical service. All installation will be in accordance with state and local requirements and specifications. Power poles, accessories, disconnect, and transformer shall be new and meet current NESC industry standards. Contractor shall also be responsible for providing all supervision, labor, tools, equipment, and other incidental items (unless otherwise noted) necessary for the clearing of existing electrical service right of way by tree removal and tree trimming. These items have been divided into a BASE with TWO OPTIONS, and will be performed at the Tenkiller Project Office location: BASE - Contractor will remove 12 existing power poles. Contractor will purchase and install 12 new power poles, with all new associated cross-arms, cutouts, fuses, accessories, guy wires, anchors, etc. Extra guy wires will be installed to secure entire electrical service.? OPTION 1 - Contractor will clear approximately 1,800 linear feet of existing right of way to the appropriate width. This work will include tree removal and tree trimming. Right of way width should be to where a fallen tree or limb will not disrupt electric power service. Trees that are removed will be to ground level.? OPTION 2 - Contractor will remove 3 existing power poles. Contractor will purchase and install 3 new power poles, and all associated cross-arms, cutouts, fuses, accessories, guy wires, anchors, etc., purchase and install 1 new electrical disconnect with breaker and riser with weather head, and purchase and install 1 pole mount pot type transformer with appropriate voltage size. This is not an amendment. Rather, it is intended to rectify the oversight in omitting the Statement of Work in the release of W912BV23Q0089.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/f49ac0ab5ce94ee7be82feb7bcf84f12/view)
- Record
- SN06801428-F 20230824/230822230056 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |