SOLICITATION NOTICE

Y -- Power Pole Replacement and Right-of-Way Clearing

Notice Date
8/22/2023 12:29:36 PM
 
Notice Type
Solicitation
 
NAICS
237130 — Power and Communication Line and Related Structures Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT TULSA TULSA OK 74137-4290 USA
 
ZIP Code
74137-4290
 
Solicitation Number
W912BV23Q0089
 
Response Due
9/22/2023 1:00:00 PM
 
Archive Date
10/06/2023
 
Point of Contact
Clinton Yandell, Phone: 918-669-7559
 
E-Mail Address
clinton.j.yandell@usace.army.mil
(clinton.j.yandell@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
Contractor shall be responsible for providing all supervision, labor, tools, equipment, and other incidental items (unless otherwise noted) necessary for the removal of 15 existing power poles and the purchase and reinstallation/replacement of a total of 15 new power poles, with the appropriate cross arms, insulators ,guywires, and other needed accessories. Extra guy wires will be installed to secure entire electrical service. All installation will be in accordance with state and local requirements and specifications. Power poles, accessories, disconnect, and transformer shall be new and meet current NESC industry standards. Contractor shall also be responsible for providing all supervision, labor, tools, equipment, and other incidental items (unless otherwise noted) necessary for the clearing of existing electrical service right of way by tree removal and tree trimming. These items have been divided into a BASE with TWO OPTIONS, and will be performed at the Tenkiller Project Office location: BASE - Contractor will remove 12 existing power poles. Contractor will purchase and install 12 new power poles, with all new associated cross-arms, cutouts, fuses, accessories, guy wires, anchors, etc. Extra guy wires will be installed to secure entire electrical service.? OPTION 1 - Contractor will clear approximately 1,800 linear feet of existing right of way to the appropriate width. This work will include tree removal and tree trimming. Right of way width should be to where a fallen tree or limb will not disrupt electric power service. Trees that are removed will be to ground level.? OPTION 2 - Contractor will remove 3 existing power poles. Contractor will purchase and install 3 new power poles, and all associated cross-arms, cutouts, fuses, accessories, guy wires, anchors, etc., purchase and install 1 new electrical disconnect with breaker and riser with weather head, and purchase and install 1 pole mount pot type transformer with appropriate voltage size. This is not an amendment. Rather, it is intended to rectify the oversight in omitting the Statement of Work in the release of W912BV23Q0089.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/f49ac0ab5ce94ee7be82feb7bcf84f12/view)
 
Record
SN06801428-F 20230824/230822230056 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.