Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 07, 2023 SAM #7954
SOLICITATION NOTICE

Y -- AZ/CA FTBR LCD PADA(1) - PARKER DAM ROAD

Notice Date
9/5/2023 1:10:12 PM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF23B000034
 
Response Due
9/19/2023 11:00:00 AM
 
Archive Date
10/04/2023
 
Point of Contact
Kelly Palmer, Phone: 720-963-3500
 
E-Mail Address
cflacquisitions@dot.gov
(cflacquisitions@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE THIS IS A TOTAL SMALL BUSINESS SET-ASIDE PROJECT NUMBER: AZ/CA FTBR LCD PADA(1) PROJECT NAME: PARKER DAM ROAD PROJECT DESCRIPTION:� This project includes pavement resurfacing, restoration, and rehabilitation along Parker Dam Road, Power House Road, an Access Road and six parking lots within the project limits, including a Bureau of Reclamation (BOR) maintenance yard parking lot. The project is located straddling the border of California and Arizona near the city of Parker, AZ. Timely completion of construction will be crucial to minimize impact on the commuter traffic. SCOPE OF THE WORK:� Proposed improvements include pavement over full depth reclamation of the existing 11-foot driving lanes and 1-foot shoulders on each side excluding across the dam. The project begins on the west side of the dam (at the south end of the eastern leg of the intersection triangle) at MWD Road, work is suspended just south of the western end of the dam, resumes just south of the eastern end of the dam, and ends at the southeast intersection with Takeoff Point Road. The parking lot improvements include fog seal treatment for the BOR maintenance yard parking lot and full depth reclamation for the remaining 5 parking lots. The total project length is approximately 0.78 miles. The weight limit across the dam is 9 tons/axle.� Concrete trucks and most heavy construction vehicles might not be able to drive of the dam. PRINCIPAL WORK ITEMS: Approximate quantities of principal work items include: 16,650 square yards of Full Depth Reclamation, Method 2, 8-inch depth 3,700 tons of Asphalt Concrete Pavement, Type 1 400 cubic yards of Subexcavation 1,600 linear feet of Guardrail Systems MGS, Type 3, Class A Steel Posts 6 miles of pavement markings The estimated price range of the project work is between $2,000,000 and $5,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d1006e928298414eac623cbddaa08009/view)
 
Place of Performance
Address: AZ, USA
Country: USA
 
Record
SN06818468-F 20230907/230905230053 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.