Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 07, 2023 SAM #7954
SOLICITATION NOTICE

Y -- Concrete Repairs, Everett Dam, Weare, NH

Notice Date
9/5/2023 9:42:02 AM
 
Notice Type
Solicitation
 
NAICS
238110 — Poured Concrete Foundation and Structure Contractors
 
Contracting Office
W2SD ENDIST NEW ENGLAND CONCORD MA 01742-2751 USA
 
ZIP Code
01742-2751
 
Solicitation Number
W912WJ23Q0108
 
Response Due
9/11/2023 2:00:00 PM
 
Archive Date
09/26/2023
 
Point of Contact
Jennifer M. Samela, Phone: 9783188324
 
E-Mail Address
jennifer.m.samela@usace.army.mil
(jennifer.m.samela@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Summary of Work: Repair of deteriorated concrete at several locations within the overall facility. Several locations inside the Inlet Weir Box.� Includes replacement of timber weir/stop logs. Minor spall and crack repairs at the Intake Tower Concrete repairs at the base of the Access Spillway Bridge Pier where it interfaces with the spillway structure. Works inside the Inlet Weir Box will be considered a Non-Permit Required Confined Space.. Time of Year Restriction:� Works inside the Inlet Weir Box will be conducted during low water season between June 15th through September 30th, 2024. Temporary Control of Water:� Contractor shall not need any temporary control of reservoir water level; however, contractor may still need some type of water control system to keep work areas inside the weir box dry during repair work due to back eddying of water, seepage, or rainwater into the weir box and center conduit. Contractor Staging Area and Access:� Contractor staging area is at the grassy area north of the dam.� Access to staging area and to all work within the weir box shall be through Clough Park Road through the Clough State Park. Coordination with Other Works:� A separate paving replacement contract for the parking lot, Dam Crest Road and access road to the toe of the dam will be occurring at the same time with this concrete repair contract.� Coordination with the other Contractor will be required for the Intake Tower and Bridge Pier repair works. Proposed Construction Sequencing: To minimize conflict with the Paving Contract, sequence work inside the weir box to start as close to June 15, 2024 as possible. The magnitude of construction is between $100,000 and $250,000.� For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil). This procurement is set-aside for small business vendors. The applicable NAICS code is 238110 with a Small Business Size Standard of $19 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/0448153c0b634542a954642fe8a20905/view)
 
Record
SN06818488-F 20230907/230905230053 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.