SOURCES SOUGHT

Y -- Pajaro River FRM Reaches 6

Notice Date
9/7/2023 2:59:07 PM
 
Notice Type
Sources Sought
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W075 ENDIST SAN FRAN SAN FRANCISCO CA 94102-3406 USA
 
ZIP Code
94102-3406
 
Solicitation Number
W912P7-23-S-XX14
 
Response Due
10/6/2023 2:00:00 PM
 
Archive Date
10/21/2023
 
Point of Contact
Logan Champlin, Phone: (415) 503 - 6953, Mary C. Fronck, Phone: (415) 503-6554, Fax: (415) 503-6688
 
E-Mail Address
logan.champlin@usace.army.mil, mary.fronck@usace.army.mil
(logan.champlin@usace.army.mil, mary.fronck@usace.army.mil)
 
Description
PROJECT DESCRIPTION:� This project is for the Reach 6 levee and floodwall construction along the Corralitots Creek, a tributary of the Pajaro River Levee System in the City of Watsonville, County of Santa Cruz. The Project consisting of 2.6 miles of flood risk management levees with approximately 111,600 compacted cubic yards (cy) of fill, and 1,500 ft of floodwalls.� The Pajaro FRM Project consists of from Reach 2 to Reach 6 of the Pajaro flood control system. This ITB is for Reach 6 of the Pajaro FRM Project. The project area is located within the lower Pajaro River watershed. It encompasses an area of approximately 10,000 acres, which includes the stream channels, active floodplains, and terraces along the Pajaro River and the Salsipuedes and Corralitos Creeks. The area is divided by the Pajaro River, which serves as a border for two counties. Santa Cruz County lies to the north of the Pajaro River, and Monterey County lies to the south. The Salsipuedes and Corralitos Creeks, which join just north of the Pajaro River in Santa Cruz County, are tributaries of the Pajaro River. The engineered levees have a crest elevation of ranging from 2 to 8 feet, a minimum crest width of 20 feet, and 3H:1V side slopes.� The access road, on top of the levee, will be surfaced with a minimum of 8 inches of CalTrans Class 2 Aggregate Base.� Structural features included in the contract include 1,500 LF of 6 ft to 9 ft high floodwall walls. The Highway 152 Bridge will be raised approximately 6 ft and it is a separate project. The first 100 ft from boarding the bridge are left for future construction with the bridge. Construction for Reach 6 is likely to be performed across the at two construction seasons. �See Attachment 1 for Site Map. There are two side channels designed to enhance eco-system restoration in the Project. The material excavated from the channels is not suitable to be used for the engineered levee along. Suited soil will be imported offsite to blend with the excavated soil for levee fill. � The site has limited access. Some of the ingress/egress are through unpaved dirt roads in farm fields. Attachment 2 shows permanent easements, staging area and hauling routes. Material from excavation will be stockpiled and mixed with imported soil onsite. REQUEST INPUT:� The Government seeks input from interested companies to better understand socio-economic capability, inform participation, and address engineering, acquisition considerations.� If your company is interested in this project, please submit a response to include the following information: Company Name Company Point of Contact Company Size Company Experience Company Bonding Limit Please submit no more than 2 projects for your experience (similar in scope, complexity, and magnitude of this project), within the last 10 years, indicating your company�s role in the execution of the work (prime or sub-contractor).� The information provided by your company will not be disclosed without your prior consent.� Please answer the following questions in your submission: What challenges (reservations) do you have about this project? � The Government contemplates utilizing a lump sum or job pricing approach for the work and does not plan to include a line item for the estimated quantity and cost per cubic yard of fill. Given this approach, what are your concerns, if any? Please submit your responses no later than October 6, 2023 2:00 pm PST.� Limit submissions to 10 pages. All interested companies must be registered in the System for Award (SAM) to be eligible for a federal contract award.� Please email responses to logan.champlin@usace.army.mil.� Please send your responses via email, and use subject line: �Sources Sought Response to W912P7-23-S-XX14�, Pajaro FRM Project Reach 6�.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/89755ce453194792878a6a9e173eff17/view)
 
Place of Performance
Address: Watsonville, CA, USA
Country: USA
 
Record
SN06823233-F 20230909/230907230105 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.