SOLICITATION NOTICE
Z -- Building 34 Chiller Replacement
- Notice Date
- 9/15/2023 5:27:12 AM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- W2SD ENDIST NORFOLK NORFOLK VA 23510-1096 USA
- ZIP Code
- 23510-1096
- Solicitation Number
- W9123623B5004
- Response Due
- 9/18/2023 11:00:00 AM
- Archive Date
- 09/14/2024
- Point of Contact
- Nicholas Lizotte, Phone: 7572017310, Katya Oxley, Phone: 7572017026
- E-Mail Address
-
Nicholas.Lizotte@usace.army.mil, ekaterina.oxley@usace.army.mil
(Nicholas.Lizotte@usace.army.mil, ekaterina.oxley@usace.army.mil)
- Small Business Set-Aside
- WOSB Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
- Awardee
- null
- Description
- 09/15/2023: Amendment 0004 posted, please see attachment. 09/14/2023: Amendment 0003 posted, see attachment. 09/06/2023: Amendment 0002 posted, see attachment. 08/24/2023: Amendment 0001 posted, see attachment. The work will include demolishing Building 34 existing chilled water equipment, which includes but not limited to: water cooled chiller, cooling tower, and pumps located in two mechanical rooms adjacent to the building entrance and replace with a similar capacity air cooled chiller with supporting equipment (pumps, expansion tanks, piping system, air separators, etc.) and new electrical infrastructure support (feeder and branch circuit, disconnect switches etc.) extending from B34 to new equipment. The existing diesel generator will be demolished and replaced with a new natural gas generator with Automatic Transfer Switch (ATS) to support back-up operation. The air-cooled chiller will be placed outdoor in the outdoor equipment area adjacent to the mechanical room. Existing electrical infrastructure to be demolished along with the existing equipment removed. Minor modification to the building structure/site work will be needed to allow removal of existing equipment and installation of new equipment in mechanical rooms and outdoor equipment yard including but not limited to: capping roofing penetrations after cooling tower is removed, wall demolition and new work, removing existing concrete equipment pads, and new underground gas piping for gas generator.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/fdb54e8afe7a41a4a49bc95975b29843/view)
- Record
- SN06833479-F 20230917/230915230058 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |