SOLICITATION NOTICE

N -- Installation of Emergency Phones

Notice Date
9/18/2023 10:02:25 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
FLETC GLYNCO PROCUREMENT OFFICE Brunswick GA 31524 USA
 
ZIP Code
31524
 
Solicitation Number
70LGLY23QSSB00162
 
Response Due
9/18/2023 1:30:00 PM
 
Archive Date
10/03/2023
 
Point of Contact
JOHN BENNETT, Phone: 9122673887
 
E-Mail Address
john.g.bennett@fletc.dhs.gov
(john.g.bennett@fletc.dhs.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Statement of Work�For�Installation of Emergency Phones at FLETC Charleston, SC Dorms Background This Statement of Work (SOW) establishes and defines the requirements for the engineering, furnishing, installation, testing and documentation of inside and outside plant fiber optic and copper cabling at Charleston, SC.� Scope of Work The contractor shall provide all personnel, equipment, tools, materials, supervision, and all other components necessary to install, test and document inside and outside plant fiber optic and copper cabling at Charleston, SC. All work performed in the design and installation shall conform to BICSI (Building Industry Consulting Services International) specifications to ensure consistency with current codes, standards, and regulations.� The following BICSI publications apply.� Outside Plant Design Reference Manual, 4th Edition and Telecommunications Distribution Methods Manual, 12th edition. General. Cable Testing.� All copper cables will be tested in accordance with BICSI specifications to insure no damage has occurred to the cable during installation.� All copper cables shall be tested for cable faults prior to and after installation has been completed.� If the cable is damaged during installation, the contractor shall replace the cable with one that is undamaged.� All cable terminals and information boxes interface units shall be labeled with machine-generated labels.� All cables shall be labeled at all termination points, building entrance terminals, patch panels, manholes, hand holes, and at all splice entrance/exit points.� Site Restoration. ��All non-paved surfaces (grass, sod, gravel, etc.) must be restored within 7 days.� Trenches and splice pits must be mechanically compacted to compensate for future earth settlement. All roads, streets, sidewalks of concrete or asphalt construction must be restored or repaved within 3 days from the time of backfilling and compaction. Grounding.� Contractor shall ensure all equipment are secured and grounded to industry standards. Description of Task 4.1������ Task 1:� Material to Installation of Emergency Phones at FLETC Charleston, SC Dorms List of materials to be provided by the contractor. Approximately 17000� of CAT 6 Unshielded Twisted Pair Cable (Blue) Sixty (60) CAT 6 Information Outlet � Blue Sixty (60) wall Phone Posted Faceplates Sixty (60) Cetis, Aegis-LBE-08 (BK), Wall Mount Emergency Ringdown ���Phone Cable tags Other Supplies as needed. Task 2:� Installation of Emergency Phones at FLETC Charleston, SC. Dorms Installation of Emergency Phones at Dormitory Building 28 at Charleston, SC. Contractor shall provide and install a Single Data Drops between the CAT 6 patch panel and 15 predetermine locations at building 28, Dormitory. three locations on each floor. (See Building Spreadsheet). � Contractor shall terminate each CAT 6 cable onto the copper cable patch panel in the IT closet at Bldg. 28. Contractor shall provide and install a Single Cetis,, Aegis-LBE-08 (BK)� Wall Mount Emergency Ringdown Phone at each of the three predetermined phone locations of� building 28. Installation of Emergency Phones at Dormitory Building 39 at Charleston, SC. Contractor shall provide and install a Single Data Drops between the CAT 6 patch panel and 25 predetermine locations at building 95, Dormitory. five locations on each floor. (See Building Spreadsheet).� Contractor shall terminate each CAT 6 cable onto the copper cable patch� panel in the IT closet at Bldg. 39. Contractor shall provide and install a Single Cetis,, Aegis-LBE-08 (BK) Wall Mount Emergency Ringdown Phone at each of the twenty-five predetermined phone locations of� building 39. Contractor shall tag and label the cable and terminal. Deliverables Equipment All equipment identified in 4.1. Documents Item identified in Task 1 and 2 Period of Performance. Period of performance for this contract is not to exceed 90 days from contract award date. Contract Type This contract shall be a firm fixed price contract. Place of Performance All Tasks work shall be performed at the Federal Law Enforcement Training Centers; US Department ��of Homeland Security; 2000 Bainbridge Ave Charleston, SC 29405-2607 Section 508 Requirements (include in the SOW, PWS, or SOO) Section 508 of the Rehabilitation Act (classified to�29 U.S.C. � 794d) requires that when Federal agencies develop, procure, maintain, or use information and communications technology (ICT), it shall be accessible to people with disabilities. Federal employees and members of the public with disabilities must be afforded access to and use of information and data comparable to that of Federal employees and members of the public without disabilities. All products, platforms and services delivered as part of this work statement that, by definition, are deemed ICT shall conform to the revised regulatory implementation of Section 508 Standards, which are located at 36�C.F.R.���1194.1 & Appendixes A, C & D, and available at�https://www.ecfr.gov/cgi-bin/text-x?SID=e1c6735e25593339a9db63534259d8ec&mc=true&node=pt36.3.1194&rgn=div5. In the revised regulation, ICT replaced the term electronic and information technology (EIT) used in the original 508 standards. ICT includes IT and other equipment. Exceptions for this work statement have been determined by DHS and only the exceptions described herein may be applied. Any request for additional exceptions shall be sent to the Contracting Officer and a determination will be made according to DHS Directive 139-05, Office of Accessible Systems and Technology, dated November 12, 2018, and DHS Instruction 139-05-001, Managing the Accessible Systems and Technology Program, dated November 20, 2018, or any successor publication. GENERAL INFORMATION Site visits are scheduled for September 13, 2023, from 1:00 to 4:00 p.m.� The point of contact for the site visit will be Mr. Ed Burkett, who can be reached via email at Edward.Burkert@fletc.dhs.gov. (843)746-3333. Mr. Burkett will be available to provide guidance during the visit. Please note that attendance at the site visit is not mandatory. Location details and any specific instructions regarding the meeting point for the site visit will be provided by Mr. Ed Burkett.� Six (6) Area Diagrams are available once a Non-Disclosure Agreement (NDA) is provided to the Contracting Officer at john.g.bennett@fletc.dhs.gov All questions concerning this solicitation shall be submitted via email no later than 09/14/2023 to john.g.bennett@fletc.dhs.gov The subject of the email must contain �Question � SOLICITATION�NUMBER [Offeror Name] 70LGLY23QSSB00162.� Questions received after this date and time may not be answered prior to the closing date/time for receipt of responses.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/44647c88e4704d29907b50284c40911f/view)
 
Place of Performance
Address: North Charleston, SC 29405, USA
Zip Code: 29405
Country: USA
 
Record
SN06835215-F 20230920/230918230123 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.