SOLICITATION NOTICE

Z -- FY24 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD

Notice Date
9/18/2023 5:53:59 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST BALTIMORE BALTIMORE MD 21201-2526 USA
 
ZIP Code
21201-2526
 
Solicitation Number
W912DR23B0018
 
Response Due
10/18/2023 8:00:00 AM
 
Archive Date
12/29/2023
 
Point of Contact
GARY FAYKES, Phone: 410-962-0192, Aisha Boykin, Phone: 4109624978
 
E-Mail Address
GARY.FAYKES@USACE.ARMY.MIL, aisha.r.boykin@usace.army.mil
(GARY.FAYKES@USACE.ARMY.MIL, aisha.r.boykin@usace.army.mil)
 
Awardee
null
 
Description
FY24 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD. The project consists of maintenance dredging approximately 1,400,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2023 through March 2024.The dredging depth varies by channel segment and ranges from 35 feet mean lower low water (ft MLLW) to 50 ft MLLW with an additional 1 foot of allowable overdepth. Approximately 1,000,000 cy will be dredged from the Maryland approach channels (Brewerton Channel Eastern Extension) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 400,000 cy will be dredged from Baltimore Harbor channels (Curtis Bay Channel) and placed at the Cox Creek Dredged Material Containment Facility. The estimated magnitude of construction is between $10,000,000.00 and $25,000,000.00. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/6736afbd68a042f5a90a0d42db59f829/view)
 
Record
SN06835400-F 20230920/230918230124 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.