Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 23, 2023 SAM #7970
SOLICITATION NOTICE

J -- Outdoor Warning System Maintenance

Notice Date
9/21/2023 11:35:29 AM
 
Notice Type
Solicitation
 
NAICS
811310 — Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
 
Contracting Office
ARGONNE NATL LAB - DOE CONTRACTOR Lemont IL 60439 USA
 
ZIP Code
60439
 
Solicitation Number
3-B187-Q-00883-00
 
Response Due
9/28/2023 11:00:00 AM
 
Archive Date
10/13/2023
 
Point of Contact
Jazlyn Mangis, Phone: 630-252-6884
 
E-Mail Address
jmangis@anl.gov
(jmangis@anl.gov)
 
Description
1. Name of Project: Outdoor Warning System Renewable Maintenance 2. Location of Project: Argonne National Laboratory 9700 Cass Avenue Lemont,� IL 60439-48033 3. Scope of Work: A. Contractor shall perform preventative maintenance inspections in accordance with, as well as documented per inspection schedule. This maintenance activity shall take placeannually at each of the following locations*: Four (4) Federal Signal, 2001 Series Outdoor Warning Siren complete with all relatedpole-mounted siren motor/RF controls and solar power distribution equipment at four site locations.� Three (3) Federal Signal Central Control Unit (CCU) complete with related PC, SS2000+encoder, base station radio and antenna system hardware at three site locations. One (1) Federal Signal FCTBDH Series Indoor PA System Interface Controller includingrelated antenna system at one site location. *Location specifics to be sent upon awarding of contract.� B.�The service to be performed by Contractor shall also consist of repair or replacement of theequipment and parts and components which have malfunctioned or become inoperative.Should any equipment defect be noted during the maintenance inspections, or, if anunscheduled system failure occurs, Contractor will submit a detailed labor and parts estimateof the repair cost. Contractor will delay such repair(s) until Argonne National Laboratoryissues either a verbal or written approval. Such delay shall not interfere with the scheduledmaintenance on the balance of the warning system. C.�All work under this contract will be performed with an Argonne escort. D. The Contractor�s installation/service personnel are responsible for the removal and off-site disposal of any debris resulting in the performance of this work. 4.�Work Schedule: This work shall be performed during Argonne normal business hours, completed annually and billed before September 1st of each calendar year. 5. Notification of Work: A. Contractor shall coordinate with the On- Site Representative. B. Contractor must complete a High Risk Job Safety Analysis Form, ESH-209, and send to the Argonne Procurement Representative, Jazlyn Mangis via email at jmangis@anl.gov.� For site access and for coordination/scheduling of delivery, the Argonne Technical Representative must receive a copy of this completed ESH-209 form. C. Contractor musy furnish an Insurance Certificate as noted in Section Three (3) of Form ANL-366H is to be sent to the Argonne Procurement Representative, Jazlyn Mangis via email at jmangis@anl.gov and shall provide by appropriate language that The UChicago Argonne, LLC, The University of Chicago and the US Government are additional insureds; that the insurance afforded by such policies is primary insurance and, that all rights of the insurer for contribution from other insurers of The UChicago Argonne, LLC, The University of Chicago and the US Government are waived. D. No on-site work shall begin until a �Notice to Proceed� is received by the contractor from the Argonne Procurement Representative.� A �Notice to Proceed� will not be issued until both the High Risk Job Safety Analysis Form, ESH-209, and the required Insurance Certificate is obtained. 6. Material and Labor to be furnished by the Contractor: Contractor will furnish all necessary labor and tools to complete the above work. 7. Post Testing Documentation Owed to the Argonne Site Representative: After completion, the Contractor shall provide a report with all the applicable information mentioned above. This report should also summarize and clearly state existing problems and the resolutions made to restore component to operational state. 8. Terms and Conditions: A. Contractor must accept��Appendix �A�-71COM, Terms and Conditions for Commercial Items and Services, ANL-71COM, dated February 13, 2023 and�High-Risk Work by Contractors on the Argonne Site Supplemental Conditions, ANL-366H, dated September 8, 2023. B. Contractor�s work on the Argonne site is subject to compliance with the ES&H requirements identified in Applicable Documentation.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/b8ea1b5db64a4779a39bf9a03861b884/view)
 
Place of Performance
Address: Lemont, IL 60439, USA
Zip Code: 60439
Country: USA
 
Record
SN06840497-F 20230923/230921230529 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.