Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 24, 2023 SAM #7971
MODIFICATION

Y -- NM FS 220(1), Romero Creek Bridge

Notice Date
9/22/2023 11:41:00 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF23B000035
 
Response Due
10/26/2023 1:00:00 PM
 
Archive Date
11/10/2023
 
Point of Contact
Laura Vallejos, Leslie Karsten
 
E-Mail Address
CFLAcquisitions@dot.gov, CFLAcquisitions@dot.gov
(CFLAcquisitions@dot.gov, CFLAcquisitions@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
PROJECT NUMBER:� NM FS 220(1) PROJECT NAME: �Romero Creek Bridge PROJECT DESCRIPTION:���This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft. The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2� to 10�).� The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition.� Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream.� NFSR 220 will be a main haul route for an upcoming restoration project within the next few years.� There is potential for thousands of loads of timber to come out on NFSR 220.� SCOPE OF THE WORK:���This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico.� The existing single-span bridge�s overall length is 30.4-ft and width (out-out) measures 16.0-ft.� The existing roadway width is 14.0-ft. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 1 (LPSM) of Removal of Existing Structures and Obstructions 250 CUYD of Embankment Construction���� 250 TON of Roadway Aggregate 100 TON of Asphalt Pavement 14-ft x 48-ft of Prefabricated Steel Bridge 50 CUYD of Structural Concrete 200 LNFT of Guardrail, including terminals 100 hours of Equipment Hours���������� 120 hours of Labor Hours ANTICIPATED SCHEDULE:� Advertise:��September 2023 Award:��November 2023 Construction:��January 2024 � October 2024� ESTIMATED COST RANGE: The anticipated cost range is�between $700,000 and $2,000,000. MISCELLANEOUS: ADDITIONAL INFORMATION FOR NOTICE: The work will be listed within a single Schedule (Schedule A) and no options are proposed. Adjacent segments of Forest Route 220 will remain closed during construction and can be used for contractor staging and storage.� Access is to both sides of the bridge is possible by detour. Shallow foundations are anticipated Anticipated Notice to Proceed in January, with ground disturbing activities starting in April.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/be96b26f53044c11b6f68c9ff1f91b50/view)
 
Place of Performance
Address: Luna, NM 87824, USA
Zip Code: 87824
Country: USA
 
Record
SN06842045-F 20230924/230922230052 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.