MODIFICATION
Y -- NM FS 220(1), Romero Creek Bridge
- Notice Date
- 9/22/2023 11:41:00 AM
- Notice Type
- Solicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
- ZIP Code
- 80228
- Solicitation Number
- 6982AF23B000035
- Response Due
- 10/26/2023 1:00:00 PM
- Archive Date
- 11/10/2023
- Point of Contact
- Laura Vallejos, Leslie Karsten
- E-Mail Address
-
CFLAcquisitions@dot.gov, CFLAcquisitions@dot.gov
(CFLAcquisitions@dot.gov, CFLAcquisitions@dot.gov)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- PROJECT NUMBER:� NM FS 220(1) PROJECT NAME: �Romero Creek Bridge PROJECT DESCRIPTION:���This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft. The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2� to 10�).� The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition.� Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream.� NFSR 220 will be a main haul route for an upcoming restoration project within the next few years.� There is potential for thousands of loads of timber to come out on NFSR 220.� SCOPE OF THE WORK:���This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico.� The existing single-span bridge�s overall length is 30.4-ft and width (out-out) measures 16.0-ft.� The existing roadway width is 14.0-ft. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 1 (LPSM) of Removal of Existing Structures and Obstructions 250 CUYD of Embankment Construction���� 250 TON of Roadway Aggregate 100 TON of Asphalt Pavement 14-ft x 48-ft of Prefabricated Steel Bridge 50 CUYD of Structural Concrete 200 LNFT of Guardrail, including terminals 100 hours of Equipment Hours���������� 120 hours of Labor Hours ANTICIPATED SCHEDULE:� Advertise:��September 2023 Award:��November 2023 Construction:��January 2024 � October 2024� ESTIMATED COST RANGE: The anticipated cost range is�between $700,000 and $2,000,000. MISCELLANEOUS: ADDITIONAL INFORMATION FOR NOTICE: The work will be listed within a single Schedule (Schedule A) and no options are proposed. Adjacent segments of Forest Route 220 will remain closed during construction and can be used for contractor staging and storage.� Access is to both sides of the bridge is possible by detour. Shallow foundations are anticipated Anticipated Notice to Proceed in January, with ground disturbing activities starting in April.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/be96b26f53044c11b6f68c9ff1f91b50/view)
- Place of Performance
- Address: Luna, NM 87824, USA
- Zip Code: 87824
- Country: USA
- Zip Code: 87824
- Record
- SN06842045-F 20230924/230922230052 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |