SOLICITATION NOTICE
Y -- Longhouse Scenic Drive Rehabilitation Project ? Allegheny National Forest McKean and Warren Counties, Pennsylvania
- Notice Date
- 9/25/2023 11:29:01 AM
- Notice Type
- Solicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- US ARMY ENGINEER DISTRICT PITTSBURG PITTSBURGH PA 15222-4198 USA
- ZIP Code
- 15222-4198
- Solicitation Number
- W911WN23B8007
- Response Due
- 10/5/2023 8:00:00 AM
- Archive Date
- 12/31/2023
- Point of Contact
- CONNIE FERGUSON, Phone: 4123957551, JOSHUA KAUFMANN, Phone: 412-395-7508
- E-Mail Address
-
connie.l.ferguson@usace.army.mil, joshua.p.kaufmann@usace.army.mil
(connie.l.ferguson@usace.army.mil, joshua.p.kaufmann@usace.army.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Awardee
- null
- Description
- Longhouse Scenic Drive Rehabilitation Project ? Allegheny National Forest, McKean and Warren Counties, Pennsylvania. - The U.S. Army Corps of Engineers, Pittsburgh District, has a project on behalf of the USDA Forest Service, Allegheny National Forest, Bradford Ranger District, to rehabilitate Longhouse Scenic Drive (FR 262) within the Allegheny National Forest, in accordance with the scope of work contained in the Interagency Agreement (IA) originally executed in July 2021.This requirement has been divided into a Base Contract and three (3) Options. The Base Contract work consists of rehabilitating Longhouse Scenic Drive (FR 262) from Station 130+96 to Station 447+00, including but not limited to the following tasks: a. Complete work to repair the landslide. b. Remove and dispose the existing culvert conveying Dutchman Run and provide an Aquatic Organism Passage structure and stream simulation. c. Remove and dispose the existing culvert conveying Dewdrop Run and provide an Aquatic Organism Passage structure and stream simulation. d. Remove and dispose the existing culvert conveying Elijah Run and provide the proposed culvert. e. Remove and dispose the existing culvert conveying Trib 56529 to Dewdrop Run and provide the proposed culvert. f. Remove and dispose existing culverts and provide 18 inch, 24 inch, 30 inch, and 36 inch culverts. g. Remove and dispose existing culvert headwalls and provide culvert headwalls for 24 inch and 30 inch culverts. h. Remove and dispose existing CMP half-pipes and/or provide culvert outlet protection. i. Address defective guide rail elements. j. Remove and dispose existing guide rail delineators and provide new delineators. k. Execute asphalt pavement 1.5 inch mill and overlay. l. Execute full width full depth pavement replacement. m. Execute known and/or miscellaneous pavement spot repairs. n. Re-establish roadside ditches. o. Perform roadside brushing and tree trimming. p. Provide pavement markings. q. Remove and dispose existing sign and post systems and/or provide new sign and post systems, pertaining to trail crossing(s).r. Protection and maintenance of traffic during construction. The Option 1 work consists of rehabilitating Longhouse Scenic Drive (FR 262) from Station 0+00 to Station 130+96 and from Station 447+00 to Station 597+86.04, and rehabilitating Jakes Rocks Road (FR 492) from Station 0+00 to Station 0+50, including but not limited to the following tasks: a. Remove and dispose the existing culvert conveying Mead Eddy Run and provide the proposed culvert and culvert outlet protection. b. Remove and dispose existing culverts and provide 18 inch, 24 inch, 30 inch, 36 inch, and 48 inch culverts. c. Remove and dispose existing culverts and provide 65 inch x 40 inch Arch RCP Type B culverts. d. Remove and dispose existing culvert and provide 36.25 inch x 22.5 inch Arch RCP Type B culvert. e. Remove and dispose existing CMP half-pipes and/or provide culvert outlet protection. f. Address defective guide rail elements. g. Remove and dispose existing guide rail delineators and provide new delineators. h. Execute asphalt pavement 1.5 inch mill and overlay. i. Execute full width full depth pavement replacement .j. Execute known and/or miscellaneous pavement spot repairs. k. Execute shoulder treatments. l. Re-establish roadside ditches. m. Perform roadside brushing and tree trimming. n. Provide pavement markings. o. Remove and dispose existing sign and post systems and/or provide new sign and post systems, pertaining to trail crossing(s). p. Protection and maintenance of traffic during construction. The Option 2 work consists of removing and disposing existing sign and post systems and/or providing new sign and post systems along Longhouse Scenic Drive (FR 262), and associated protection and maintenance of traffic during construction. The Option 3 work consists of completing all work to construct proposed Vehicular Pull-Off Areas 1, 3, 6, 10, and 11 along Longhouse Scenic Drive (FR 262), and associated protection and maintenance of traffic during construction. *** NOTICE *** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/1100a1a0edc94c83a58d140941e16307/view)
- Record
- SN06843923-F 20230927/230925231118 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |