SOLICITATION NOTICE
20 -- CHEYENNE MOLD REMEDIATION
- Notice Date
- 9/25/2023 12:17:24 PM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 336611
— Ship Building and Repairing
- Contracting Office
- SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
- ZIP Code
- 94501
- Solicitation Number
- 70Z08523QP23216
- Response Due
- 9/27/2023 12:00:00 PM
- Archive Date
- 10/12/2023
- Point of Contact
- ERIC FOSTER, Phone: 5104375431, Chad Wondrash, Phone: 410-762-6950
- E-Mail Address
-
ERIC.T.FOSTER@USCG.MIL, Chad.E.Wondrash@uscg.mil
(ERIC.T.FOSTER@USCG.MIL, Chad.E.Wondrash@uscg.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- This is a combined synopsis/solicitation for commercial items/services prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. Request for Quotations number is 70Z0-8523-Q-P23216 and is issued as a request for quotations (RFQ). This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-65 dated January 29, 2013. The NAICS Code is 336611. The small business size standard is 1250. This is a total small business set aside. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. All responses from interested vendors must be�received on/before 1200pm Pacific Time, Sep 27th, 2023, and will be reviewed by the Government. �� The United States Coast Guard Surface Force Logistics Center has a requirement for the following: The CTR shall provide: CHEYENNE discovered mold in their berthing and common area and has an immediate need for technical support for tasks outlined in this Statement of Work (SOW). 1.0 GENERAL Background� The 75� WLR asset, USCGC CHEYENNE, for approximately 1471 square feet of overhead and bulkhead insulation that needs to be removed and remediated of any mold behind the insulation. � �Scope� The scope of this contract is defined by the efforts and tools required to support USCGC CHEYENNE (WRL 75405). The Contractor shall provide all labor, materials, and tools necessary to remove insulation and remediate mold. OBJECTIVE The goal is to return CGC CHEYENNE air quality and habitability conditions to acceptable conditions. APPLICABLE DOCUMENTS Compliance Documents The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract: �������������� Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2022, General Requirements 29 Code of Federal Regulations (CFR) Part 1915, Occupational Safety and Health Standards for Shipyards� SPECIFIC REQUIREMENTS/TASKS Unless otherwise stated, this contract applies to on-site support for USCGC CHEYENNE (WRL 75405) in St Louis, MO. 2.1 Remediate Mold The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work. The Contractor shall remove the overhead and bulkhead panels to access areas suspected of mold. � The Contractor shall remove and dispose of insulation The Contractor shall test the identified areas for mold in the following areas. ��Crew Berthing �Approximately 357 square feet ��OIC Stateroom & Head:� Approximately 176 square feet ��Main Deck Passageway �Approximately 100 square feet ��Galley �Approximately 330 square feet ��Crew Head �Approximately 182 square feet ��Log Office �Approximately 36 square feet ��01 Deck Passageway �Approximately 25 square feet ��CPO Berthing �Approximately 132 square feet. ��Pilothouse- Approximately 132 square feet. The Contractor shall remediate all mold discovered in the areas identified in section 2.1.3. Contractor shall use industry standard means of remediation that are approved by federal and state agencies governing mold remediation. The Contractor shall install plastic sheeting to all the areas where the bulkhead and overhead panels were removed to prevent insulation dust/debris falling on the crew while underway. 2.2 Test Thoroughly and Document The Contractor shall ensure the cutter is fully remediated of mold by preforming a walkthrough of all spaces identified in section 2.1.3. with the Engineer Petty Officer (EPO) or the EPO�s designated representative. 2.2.1 ���� The Contractor shall provide a trip report documenting all findings no later �������������� than 7 days after returning to the home office. CONTRACTOR PERSONNEL� 3.1 ������� The Contractor shall provide qualified personnel to perform all requirements specified in this SOW. OTHER APPLICABLE CONDITIONS 4.1 PERIOD of Performance� The period of performance for this contract shall not exceed 7 calendar days from the date of award. 4.2 PLACE OF PERFORMANCE� The primary place of performance will be at CGC CHEYENNE at 100 Arsenal Street, St Louis, MO 63118 unless an alternate location is approved by the Coast Guard. 4.3 HOURS OF OPERATION Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays).� However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Petty Officer (EPO) as scheduling is subject to ship�s operations.� 4.4 TRAVEL� Contractor travel may be required to support this requirement.� All travel required by this task shall be provided by the Contractor at no expense to the Government. 5.0 GOVERNMENT FURNISHED RESOURCES NONE 6.0 CONTRACTOR FURNISHED PROPERTY� The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0. GOVERNMENT ACCEPTANCE PERIOD The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance.� If the deliverable is acceptable, the EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted. ���������� 8.0 DELIVERABLES The Contractor shall provide a trip report and warranty no later than 7 days after returning to the home office. Questions and quotes shall be emailed to Eric.T.Foster@uscg.mil and Chad.E.Wondrash@uscg.mil. Contractors are responsible for verifying receipt of quotes.INTERESTED VENDORS PLEASE SIGN AN OFFICIAL QUOTE WITH A SAM.GOV REGISTERED DUNS NUMBER AND EMAIL TO Eric.T.Foster@USCG.MIL and �Chad.E.Wondrash@uscg.mil.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/b1bdd19ce3c24cd0b2780cebbd2db08a/view)
- Place of Performance
- Address: Saint Louis, MO 63118, USA
- Zip Code: 63118
- Country: USA
- Zip Code: 63118
- Record
- SN06844015-F 20230927/230925231118 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |