SOLICITATION NOTICE

N -- Gallery Flooding Mitigation at Braddock Locks and Dam

Notice Date
10/17/2023 11:15:24 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT PITTSBURG PITTSBURGH PA 15222-4198 USA
 
ZIP Code
15222-4198
 
Solicitation Number
W911WN24B8003
 
Response Due
11/17/2023 9:00:00 AM
 
Archive Date
12/18/2023
 
Point of Contact
Aaron Barr, Phone: 412-395-7157, JOSHUA KAUFMANN, Phone: 412-395-7508
 
E-Mail Address
aaron.m.barr@usace.army.mil, joshua.p.kaufmann@usace.army.mil
(aaron.m.barr@usace.army.mil, joshua.p.kaufmann@usace.army.mil)
 
Awardee
null
 
Description
The U.S. Army Corps of Engineers (USACE), Pittsburgh District intends to procure a (construction) project that involves the construction of pumping systems capable of preventing flooding of galleries at Monongahela River Locks and Dam 2 (Braddock Locks and Dam), Braddock, Allegheny County, PA under normal upstream pool levels. The pumping systems consist of three Government-furnished pump stations and piping. The major features of work are listed below: 1. Mechanical, Electrical and Structural Demolition and Disposal Removal of abandoned hydraulic piping and valves and disposal of oil. Removal of unused electrical and existing ladder wrungs. Concrete Work consisting of fill of hydraulic pit for pump station install Removal of section of jib crane pad on landwall Delivery of Government-furnished equipment to Braddock Locks and Dam Three self-priming pump stations, enclosure, controls and sparesInstallation and modification of miscellaneous existing featuresMetal screening over wet wells and modification of hatch covers and lower approach grating Installation of pump suction and discharge piping, appurtances, electrical and all controlsTypical pool elevations at Monongahela Locks and Dam 2, where work will be performed, are 718.7 upstream and 710.2 downstream (all elevations are based on the NGVD 88 datum). Debris and rubbish shall be disposed of at a properly permitted facility licensed to accept waste or recyclable materials, as applicable. Construction work will occur in close proximity to waterway traffic. The work shall be completed within 180 calendar days after written Notice to Proceed. In accordance with FAR 36.204 and DFARS 236.204, the estimated magnitude of this construction project is: Between $500,000 to $1,000,000. ****NOTE: Please contact Janie L. Roney, Contract Specialist for this action with any questions at (412) 395-7474 or email at Janie.L.Roney@usace.army.mil **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/12a4abf727324c8daf8583ab2c7cd622/view)
 
Record
SN06861102-F 20231019/231017230045 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.