Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 19, 2023 SAM #7996
SOLICITATION NOTICE

Z -- Grand Canyon Village Housing Roof and Exterior Repairs

Notice Date
10/17/2023 6:50:09 AM
 
Notice Type
Solicitation
 
NAICS
238160 — Roofing Contractors
 
Contracting Office
697DCK REGIONAL ACQUISITIONS SVCS FORT WORTH TX 76177 USA
 
ZIP Code
76177
 
Solicitation Number
00001
 
Response Due
11/6/2023 2:00:00 PM
 
Archive Date
11/21/2023
 
Point of Contact
Rodgers Cox
 
E-Mail Address
rodgers.l.cox@faa.gov
(rodgers.l.cox@faa.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
1. Priority 1 � Units 2, 4, and 5 exterior repairs a. Repair or replace all damaged metal roof vents assemblies (boot, vertical sack, and cap) b. Repair or replace all damaged ABS roof vent assemblies (boot, vertical pipe, and turndown cap) c. Install adequate snow guards to prevent glaciating and sluffing snow i. North elevation roof (Units 2 and 4) 1. 72�x28� 2. Slope @ 3:12 3. TJI (11-7/8�) @ 24� O.C. ii. South elevation roof (Units 2 and 4) 1. 72�x8� 2. Slope @ 4:12 3. TJI (11-7/8�) @ 24� O.C. iii. North elevation roof (Units 5) 1. 36�x28� and 36�x19� 2. Slope @ 3:12 3. TJI (11-7/8�) @ 24� O.C. iv. Southeast elevation roof (Units 5) 1. 36�x25� 2. Slope @ 4:12 3. TJI (11-7/8�) @ 16� O.C. v. Southeast elevation roof (Units 5) 1. 36�x8� 2. Slope @ 4:12 3. TJI (11-7/8�) @ 24� O.C. d. Install snow diverters or listed support assemblies for all roof mounted vents e. Repair damaged rear door awnings and reinforce existing awnings to protect occupants against sluffing snow (2 awnings per unit) 2. Priority 2 � Units 1, 6, 14, 30, and 32 exterior repairs a. Inspect all roof mounted vent assemblies for damage and repair as needed b. Install snow guards over all entry locations for occupant safety and over areas where ground mounted equipment could be damaged (e.g., AC condenser, satellite dish, etc.) c. Install snow diverters or listed support assemblies for roof vents and chimneys as required 3. Priority 3 � Units 1, 2, 4, 5, 6, 14, 30, and 32 interior repairs a. Repair all moisture and water damaged sheetrock i. Units 2, 4, and 5 have most substantial damage b. Repair or replace casework with moisture and water damage c. Reinstate all final finishes to that of original construction (e.g., paint and texture) 4. Site cleanup
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/5a3b772e373e46d8b55b415d4f79347a/view)
 
Place of Performance
Address: Grand Canyon, AZ 86023, USA
Zip Code: 86023
Country: USA
 
Record
SN06861234-F 20231019/231017230046 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.