SOLICITATION NOTICE
58 -- 58--TILE,RUBBER
- Notice Date
- 10/23/2023 1:00:49 AM
- Notice Type
- Solicitation
- NAICS
- 334511
— Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
- ZIP Code
- 17050-0788
- Solicitation Number
- N0010423RUC29
- Response Due
- 11/20/2023 10:00:00 AM
- Archive Date
- 12/05/2023
- Point of Contact
- Telephone: 7176052640
- E-Mail Address
-
MATTHEW.TAKACH@NAVY.MIL
(MATTHEW.TAKACH@NAVY.MIL)
- Description
- ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Combo||TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC (JAN2023))|3|||| LIST OF AWARD ATTACHMENTS|5|||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (DEC 2022))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|334511|1350|||||||||||| TYPE OF CONTRACT (APR 1984)|1|FIRM-FIXED PRICE| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||| Please provide price as firm-fixed with all costs associated with production or procurement of new items. Please note, the quote must agree to Government Source Inspection (GSI) and Commercial Asset Visibility (CAV) reporting. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the TILE,RUBBER . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254). The classified documents and security level are: ;SECRET; DOCUMENT REF DATA=MIL-STD-129 | | |P |041029|A| |03| DOCUMENT REF DATA=MIL-STD-130 | | |M |051202|A| | | DOCUMENT REF DATA=ISO 9001 | | | | |A| | | DOCUMENT REF DATA=ISO 9002 | | | | |A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |961001|A|2 | | 3. REQUIREMENTS 3.1 ;The Tile, Type 3R furnished under this contract/purchase order shall be in accordance with the design represented by Cage Code 34008, p/n 7338390-4, 7338390, 7538395 AND 7538398 (PHS&T INSTRUCTION). These drawings and Material Specification are not furnished as part of this solicitation. The approved sources have those drawings and material specifications in their possession.; 3.1.1 ;This contract/purchase order serves as the procurement vehicle to acquire Radar Absorbing Material (RAM) in the form of Type 3R materials for installation on-board U.S. Navy ships. The design of the type material is a Navy design and will not be allowed to be sold, marketed or in any way transferred to other commercial or Government sources without written consent of Naval Sea Systems Command (NAVSEA 05T1). All materials manufactured for this contract/purchase order will be manufactured in accordance with the Material Specification Type 3R (Unclassified and Classified), document number 7538395. Additionally, materials will need to be manufactured IAW with their respective drawings. Type 3R materials will be installed on U.S. Navy ships. During this time, the material will be exposed to a shipboard environment that will include significant fluctuations in humidity and temperature, the corrosive effects of salt spray and the damage caused by UV exposure.; 3.2 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.3 ;The contractor shall manufacture all Type 3R material to meet all the requirements in the Material Specification Type 3R (Unclassified and Classified). In the event that there is a conflict between the text of this contract/purchase order and the refernces and/or drawings cited herein, the material specification shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.; 3.4 ;Assignment of Serial Numbers - All materials will be assigned a sequential serial number at the completion of the fabrication phase. The assignment shall be done prior to performing any electrical testing or other type of testing. If the contractor observes any obvious cosmetic problems, they have the option to remove the material prior to performing either environmental or electrical testing, but this material shall still receive a serial number. The contractor shall be required to submit a report listing the serial numbers of the materials, method of failure and the certification of destruction IAW Contract Data Requirements List (CDRL), DI-S-30591, every Six (6) months.; 3.5 ;Assignment of Lot Numbers - Lot size is defined as 1000 Type 3R tiles, plus ten (10), ordered on a given task order. Lot numbers shall be associated with each item.; 3.6 ;Post-Production - When the Government takes delivery of the material, the following requirements must be met.; 3.7 ;ECPs, Waivers and Deviations - (FAR 46.102/46/407): All critical, major and minor Waivers and Deviations will be written on DD 1694 Forms. The request will be submitted for review and approval/disapproval by PHD NSWC.; 3.8 ;Production Lot Test Procedures are required as specified in the Contract Data Requirements List (CDRL) DI-NDTI-80603.; 3.8.1 ;The Production Lot Test Procedure shall be submitted and approved by PHD NSWC, S13 prior to commencing production.; 3.9 ;PRODUCTION LOT SAMPLES SHALL BE RANDOMLY SELECTED FROM THE PRODUCTION LOT AND SUBMITTED TO THE ISEA PHD FOR TESTING. THE RESULTS OF PRODUCTION LOT SAMPLE TESTING WILL INDICATE THE ACCEPTABLILITY OF THE PRODUCTION LOT PRIOR TO SHIPMENT.; 3.10 ;Special Test Equipment: Special test Equipment is required per the Material Specification (7538395) and is not furnished by the Government.; 3.11 ;Special Marking, Packaging and Serial Number Requirements: Special marking, Packaging and Serialization are required by the PCMS, Packaging, Handling, Storage and Transportation Instruction (PHS&T) 7538398 LATEST REV and Drawing Number 7338390.; 3.12 ;Security Form DD 254 (Far 53.204-1a): Classified testing is required per the Material Specification. This material requires strict accountability, any loss of this material that can not be reconciled shall be reported to PHD NSWC, Code S13. Reasonable operational security will be taken to ensure that only authorized personnel are allowed access to this material and data. ONLY U.S. CITZENS are authorized to accomplish and partake in the manufacture, packaging, handling, storage and transportation of this material. In addition a Non-Disclosure statement must be signed, and returned to the PCO prior to receiving technical data/specifications from the ISEA.; 3.12 IF THE CONTRACTOR CHANGES LOCATIONS OF THEIR MANUFACTURING FACILITY OR GOES THROUGH GREATER THAN 50% TURNOVER IN PERSONNEL IN LESS THAN 2 MONTHS TIME, THE GOVERNMENT HAS THE UNILATERAL RIGHT TO REQUIRE REQUALIFICATION OF THE NEW MATERIAL AND PROCESS AND NO DELAYS TO THE AGREED UPON DELIVERY SCHEDULE WILL BE PERMITTED. IF THE CONTRACTOR CANNOT COMPLY WITH THESE REQUIREMENTS THE GOVERNMENT HAS THE RIGHT TO TERMINATE THE CONTRACT FOR DEFAULT PURSUIANT TO FAR CLAUSE 52.249-8. 3.13 Security Clearance Required - This contract/purchase order requires the Contractor to have a Government Security Clearance in accordance with the attached Contract Security Classification Specification (DD Form 254). 4. QUALITY ASSURANCE 4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.2 ;Production Lot - Production Lot Acceptance Testing: Suppliers must perform 100% electrical testing as stated in the Material Specification (7538395. The Government reserves the right to review and audit the suppliers approved written Production Procedures and witness any Production Testing so stipulated in the approved written procedures After each acceptable production lot run; lot size has been tailored for this procurement and detailed in the remarks section of the applicable DD Form 1423, Production Lot Test Report, suppliers will submit test specimen samples and electrical test data as specified elsewhere in the contract/purchase order. Serial numbers of each tile tested shall be annotated on the test report.; THE GOVERNMENT WILL HAVE A COMPLETED TEST REPORT WITHIN 60 DAYS OF RECEIPT OF THE SAMPLES AND SUBSEQUENT ELECTRICAL TEST REPORT FOR EACH PRODUCTION LOT FROM THE CONTRACTOR. 4.2.1 ;These samples and data will be used for Compatibility Test evaluation by PHD. A written Compatibility Test Report will be submitted to the Procuring Contracting Officer (PCO), by PHD. The PCO will communicate the report results to the supplier, notifying them of its findings.; 4.2.2 ;Electrical Testing: The contractor shall comply with all the requirements of the material specification identified in paragraph 2. Any variance to the procedures identified in this document must have prior written approval from the Government. Additionally, the contractor must comply with the following test requirements: Material is to be tested only one time in the 0 and 90 degree orientation or parallel and perpendicular polarizations. If the material does not meet the required performance levels identified in the material specification, the material is to be set aside without further testing. During this time the contractor may choose to re-work or condition the material. After re-work or conditioning, the contractor may test the material again to see if it is now within the specification requirements. If the material still does not meet the minimum requirements of the electrical specifications it must be set aside and not tested further. The last set of test results for this tile will be considered it's final test result. The contractor may contact the Government to discuss the disposition of the material. This testing specifically precludes multiple (more than 2 test) to try to get the material to meet the required minimum requirements.; 4.3 Production Lot Test/Inspection Report - The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423). 4.4 Production Lot Test Approval - Production Lot Test approval is required prior to shipment of the Production Lot. 4.5 ;ISO 9001 is required to be maintained and be current, for the purpose of maintaining engineering source approval. DCMA's only need to verify that the ISO 9001 Certificate is current. Approved sources must provide a PDF copy of their ISO 9001 certificate when renewed or recertified, to the appropriate ISEA. ; MATERIAL FAILURE ADJUDICATION: IF THE MATERIAL IS FOUND TO BE NON-COMPLIANT WITH THE MATERIAL SPECIFICATION, THE CONTRACTOR SHALL BE REQUIRED TO CONDUCT A FAILURE ANALYSIS AND SHALL TAKE ALL NECESSARY ACTIONS TO REMEDIATE THE FAILURE AT NO COST TO THE GOVERNMENT. ANY SUCH FAILURE(S) SHALL BE REPLACED OR RECONDITIONED BY THE CONTRACTOR TO MEET ALL REQUIREMENTS IDENTIFIED IN THE MATERIAL SPECIFICATION AT NO COST TO THE GOVERNMENT. THE GOVERNMENT HAS THE RIGHT TO RETEST THE REPLACED OR RECONDITIONED MATERIALS TO ENSURE COMPLIANCE WITH THE SPECIFICATION BEFORE ACCEPTING THE MATERIAL IN QUESTION. NRL ARCH SETTINGS: In order to correlate measurements between PHD Testing Laboratory and Manufacturing Testing, basic NRL configuration setup, calibration and testing of radar absorbing material on an NRL Arch may be requested from the ISEA on a case by case basis. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. 5.2 ;The marking requirements for both the Marking of Materials (MIL-STD-130) and the Outside Container Markings (MIL-STD-129) should be as follows: DOM: YY/MM/DD Inspect/Test Date: YY/MM; MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for ""Official Use Only"" and ""NOFORN"" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH. 6.2 ;Parties interested in qualifying for the manufacture of the Type 3R tiles should contact: PHD NSWC Code S13, Bldg 1214 4363 Missile Way Port Hueneme, Ca 94043 ATTN: Robin Nussear; SERIAL NUMBERS AND LABELS - TILES MAY HAVE HANDWRITTEN SERIAL NUMBERS ON THE BACK AND CORRESPONDING LABELS PLACED IN AN ENVELOPE IN THE RESPECTIVE PACKAGIING CONTAINER PRIOR TO PRESSURE SENSITIVE ADHESIVE (PSA) APPLICATION. THIS MAY BE DONE TO ALLEVIATE PROBLEMS WHEN APPLYING PSA AS THE REMOVAL OF LABELS AND PSA APPLICATION HAS RESULTED IN A FAILURE POINT IN THE PAST. ASPECTS OF INDIVIDUAL TILE SERIAL NUMBER MARKING ARE CONTAINED IN LATEST PHS&T ONLY ONE SERIAL NUMBER TAG SHALL BE REQUIRED AFFIXED IN AN UNSPECIFIED CORNER OF THE FINISHED TILE IN LIEU OF FOUR, (ONE IN EACH CORNER) AS PREVISOULY SPECIFIED. DATE OF FIRST SUBMISSION=ASREQ ;Block 16: Government approval/disapproval shall be 30 days after receipt. Block 5 - As specified by Naval Sea Systems Command drawing 7338390 and 7538395. Block 12 - Test procedures shall be submitted NLT 30 days after contract award. Approval or reason for disapproval shall be given NLT 30 days after received by PHD NSWC Code S13. Block 13 - NLT 30 days after disapproval. ; DATE OF FIRST SUBMISSION=ASREQ ;Block 16 Block 5 - Test reports shall be IAW Naval Sea Systems Command drawing 7338390 and 7538395. Block 12 - Test report shall be submitted NLT 15 days after completion of testing along with test samples to PHD NSWC Code S13.; Production Lot sizes have been determined as follows: Lot 1 shall be 1,000 ea plus 10 With PSA THE 100% ELECTRICAL TEST DATA IS CLASSIFIED AND SHALL BE HANDLED ACCORDINGLY. DATE OF FIRST SUBMISSION=ASREQ ;Block 12 - Contractor shall submit a report listing the serial numbers of the material, method of failure and certification of destruction beginning six (6) months after the start of production and continuing at six (6) month intervals.;
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/dbc0cafd65014c02a5852068b519cb01/view)
- Record
- SN06865970-F 20231025/231023230045 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |