SOLICITATION NOTICE

Y -- C.W. Bill Young Lock and Dam, Operations Building and Cupola Roof Replacements

Notice Date
10/31/2023 5:57:10 AM
 
Notice Type
Solicitation
 
NAICS
238160 — Roofing Contractors
 
Contracting Office
US ARMY ENGINEER DISTRICT PITTSBURG PITTSBURGH PA 15222-4198 USA
 
ZIP Code
15222-4198
 
Solicitation Number
W911WN24Q8000
 
Response Due
11/21/2023 1:00:00 PM
 
Archive Date
12/29/2023
 
Point of Contact
Aaron Barr, Phone: 412-395-7157, Janie RONEY, Phone: 412-395-7474
 
E-Mail Address
aaron.m.barr@usace.army.mil, janie.l.roney@usace.army.mil
(aaron.m.barr@usace.army.mil, janie.l.roney@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
The U.S. Army Corps of Engineers, Pittsburgh District, has a project at the C. W. Bill Young Lock and Dam in New Kensington, PA. The work consists of removing and replacing roofs on the Operations Building as follows: Operations Building ? Remove the existing roofing materials, insulation, roof drain covers, and existing EPDM from the operations building. Install a new, fully adhered, 90 mil EPDM roofing system, conforming to ASTM D4637/D4637M. The roofing system shall have new tapered insulation with RValue of at least 30, in accordance with (IAW) ASHRAE 90.1-2019, and include the addition of any saddles, crickets, curbs, or other features to ensure positive drainage to the roof drains. Placement of insulation will accommodate roof expansion and the strategy for this accommodation will be documented in the roof plan. New flashing shall be installed on remaining protrusions and the parapet wall. Inspect and repair the drains and install new roof drain covers. The new drain inserts will replace existing roof drains.Cupola Roof ? Contractor shall demolish the old shingle roof to include sheathing, asphalt shingles, drip edge, etc. Contractor shall replace Cupola roof, from where the roof attaches to the walls, with a new wood frame, new wood sheathing and shingle roof system. Replace copying the existing design as specified in separate attachment Attachment 2 ? Roof Plan Summary. Repair or replacement of the Cupola walls is not a part of this contract.The period of performance is 270 calendar days after receipt of the Notice to Proceed. This is a Request for Quote (RFQ). This requirement is 100% Set-Aside for Small Businesses. Please see attached documents on the project including the Solicitation and the eight (8) Attachments.**NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/1863154f197c4cd4af7a691686883f2a/view)
 
Record
SN06872092-F 20231102/231031230049 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.