Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 03, 2023 SAM #8011
SOLICITATION NOTICE

Z -- Repaint Service Bridge, Mosquito Lake, Trumbull County, Ohio

Notice Date
11/1/2023 9:39:03 AM
 
Notice Type
Solicitation
 
NAICS
238320 — Painting and Wall Covering Contractors
 
Contracting Office
US ARMY ENGINEER DISTRICT PITTSBURG PITTSBURGH PA 15222-4198 USA
 
ZIP Code
15222-4198
 
Solicitation Number
W911WN24B8005
 
Response Due
12/7/2023 8:00:00 AM
 
Archive Date
02/15/2024
 
Point of Contact
CONNIE FERGUSON, Phone: 4123957551, Janie RONEY, Phone: 412-395-7474
 
E-Mail Address
connie.l.ferguson@usace.army.mil, janie.l.roney@usace.army.mil
(connie.l.ferguson@usace.army.mil, janie.l.roney@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
Repaint Service Bridge, Mosquito Lake, Trumbull County, Ohio The U.S. Army Corps of Engineers, Pittsburgh District, has a project that the repainting of the Mosquito Creek Service Bridge which has several tasks that the Contractor must complete, all of which are on the Service Bridge. The Contract work consists of the following work tasks and activities:a. Steel bridge super structure, including steel parapet roadway walls, to be white metal blasted. Not included are guide rails approaching bridge, hand rails or transition plates on bridge deck. Contractor is responsible for protecting active pipe and conduit under the bridge. Contractor is responsible for removing or protecting abandoned pipe and conduit under the bridge. Contractor will remove prior to painting and blasting.b. Entire steel bridge super structure to be repainted as described in 09 97 02 PAINTING: HYDRAULIC STRUCTURES. Not included are guide rails approaching bridge, handle rails or transition plates on bridge deck.c. A new fence and gate will be installed post painting. Contractor is responsible for removing signage from existing fence gate and installing the signage on the new gate.d. Existing bridge paint coatings contain lead based coating and shall be properly removed and disposed in accordance with all federal, state and local laws and provisions.The work shall be completed within 365 calendar days after written Notice to Proceed.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/862fc6b8cca245bda81b377bce495178/view)
 
Record
SN06873344-F 20231103/231101230055 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.