Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 19, 2023 SAM #8027
MODIFICATION

J -- Fire Suppression Pipe Repair/Roof Repair Fort Washington

Notice Date
11/17/2023 10:32:05 AM
 
Notice Type
Solicitation
 
NAICS
541990 — All Other Professional, Scientific, and Technical Services
 
Contracting Office
VETERANS BENEFITS ADMIN (36C10D) WASHINGTON DC 20006 USA
 
ZIP Code
20006
 
Solicitation Number
36C10D24Q0007
 
Response Due
12/22/2023 12:00:00 PM
 
Archive Date
02/20/2024
 
Point of Contact
Eric C Davidson, Contract Specialist
 
E-Mail Address
eric.davidson@va.gov
(eric.davidson@va.gov)
 
Awardee
null
 
Description
Life Safety Repairs 1 Introduction The Fort Harrison VA Regional Office, VARO is in need of awarding a contract to repair three life safety issues; leaking dry sprinkler line pipes, replace fire control panel and leaking roof. 1.1 Background Dry Pipe - For the past year the Fort Harrison VARO has been spending considerable amount of dollars in repairs to the dry pipe system.  Due to the age of the pipe s condensation has accumulated in the pipes.  Over time small pin holes develop due to rusting and when that happens the air pressure drops, and the air compressor comes on trying to establish the correct pressure.  Over time the compressor comes on/off numerous times during the day that then leads to compressor malfunction.  When the holes get too large, and the compressor cannot reestablish the pressure in the line the system charges and alerts the local fire department.  All the water must then be drained, and the pin holes repaired before the system can be repressurized.  Even though a nitrogen system has been installed the pin holes continue to develop.  One nitrogen compressor (less than year old) has already been replaced. Fire Alarm Control Panel - failed recent quarterly Fire Alarm Inspection Roof - each year during the winter/spring season numerous leaks develop inside the FHM VARO.  This is due to possible ineffective installation of the roof system specifically where the flat roof and the hip roof join.  Melting snow (water) gets under the flashing at this joint and during the re-freeze of that water during the night heaving results making the damage worse.  More water gets under the flashing and eventually a leak results in the attic area.  The water then gets absorbed by the insultation (possible mold environment) and eventual comes through the ceiling tiles.  Often the ceiling tile holds the water until the tile breaks and falls inside the office space.  This area of the roof needs to be investigated and repaired. 1.2 Scope GENERAL - Contractor will provide all parts, labor, and materials to replace the dry pipeline (fire line) and repair damaged roof of the Fort Harrison VARO.  Repairs to the file dry pipeline will be within NFPA 13 Sprinkler Systems standards and all roof repairs will be within local, state, and federal construction standards. Replace Fire Control Panel IAW NFPA standards. 2 General Requirements This section describes the general requirements for this effort. The following sub-sections provide details of various considerations on this effort.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/1594ddbc9f674f1ab389db9f2064fd7d/view)
 
Record
SN06888542-F 20231119/231117230049 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.