Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 24, 2023 SAM #8032
SOLICITATION NOTICE

J -- CGC Stratton NR2 Reefer System Groom and Service

Notice Date
11/22/2023 9:20:22 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
 
ZIP Code
94501
 
Solicitation Number
70Z058524P0001072
 
Response Due
12/3/2023 8:00:00 AM
 
Archive Date
12/18/2023
 
Point of Contact
KYLER FISK, Phone: 9492881271, GEORGE, JERAMYAH, Phone: 5104375436
 
E-Mail Address
KYLER.C.FISK@USCG.MIL, JERAMYAH.W.GEORGE@USCG.MIL
(KYLER.C.FISK@USCG.MIL, JERAMYAH.W.GEORGE@USCG.MIL)
 
Description
Reefer Plant Groom Statement of Work Background. Complete a groom of the Ship�s Refrigeration Plant to replace/rebuild worn components, complete preventative maintenance, and ensure system integrity. Scope.: Complete a groom of the Ship�s Refrigeration Plant to replace/rebuild worn components, complete preventative maintenance, and ensure system integrity in accordance with the following references: A and B. Test Operate NR2 skid verifying operation of heater, compressor, compressor stage loading, function of pressure switches and gauges. Prior to securing unit, draw lube oil samples from each unit to send for analysis. Test function of all heaters on Evaporators, Evaporator Drip Pans, and Drain Lines. Rebuild or replace valves in the system from the GFP list. In addition, contractor will replace dehydrator cartridges, sight glass moisture indicators, and oil filters. The Oil Cooler and Refrigerant Condenser end bells will be removed and tubes checked for clogs. Clean Evaporator Y-Strainer and renew gasket. Once all parts are rebuilt or replaced, system will be pressurized with nitrogen to check for/fix any leaks. Once all leaks are fixed, all insulation on manifold boards need to be replaced. System will be refilled with oil. SF will pull each unit into vacuum less than 500 microns, break vacuum with refrigerant vapor, and charge each skid with 107 lbs R-134a. Ensure proper superheat on all Evaporators. Each compressor shall be run for a minimum of 24 hours for test op and then oil samples sent for analysis.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/3f254a7e6c8940d9a1de7fd16dcd8167/view)
 
Place of Performance
Address: Alameda, CA 94501, USA
Zip Code: 94501
Country: USA
 
Record
SN06892516-F 20231124/231122230047 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.