Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 29, 2023 SAM #8037
SOLICITATION NOTICE

Y -- CA FLAP ED CR 147(2) Ice House Road

Notice Date
11/27/2023 1:14:32 PM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF22B000032
 
Response Due
11/7/2023 1:00:00 PM
 
Archive Date
01/15/2024
 
Point of Contact
Leslie Karsten, Ryan Phillips
 
E-Mail Address
CFLContracts@dot.gov, CFLContracts@dot.gov
(CFLContracts@dot.gov, CFLContracts@dot.gov)
 
Description
PROJECT DETAILS: CA FLAP ED CR 147(2) Ice House Road PROJECT DESCRIPTION:� Ice House Road, also designated as County Road 147, is located in El Dorado County, California, and provides recreational access to the world-renowned off-highway vehicle Rubicon Trail, the Crystal Basin Recreation Area within the ENF, the Desolation Wilderness area, Loon Lake, Union Valley Reservoir, and Ice House Reservoir. The route is heavily used by vehicles with trailers hauling boats, horses, off-road vehicles and other recreational vehicles. Within the project limits, the road provides direct access to numerous recreational trails and campgrounds, including the Loon Lake area, and Ice House Resort. SCOPE OF THE WORK:� The proposed action is generally described as a 3R rehabilitation project. The improvements consist of a full-depth reclamation which will pulverize and replace the existing two-lane paved roadway with new 11-foot lanes and 1-foot shoulders along Ice House Road from Peavine Ridge Road to Wentworth Springs. This is consistent with the existing roadway which averages a 24-foot width. Minor drainage improvements will also be completed, including paved ditch and asphalt curb replacements or extensions, culvert cleaning, repairs/adjustments and replacements, the addition of underdrain, ditch reconditioning and regrading, and select areas of riprap lining along ditches. Scaling and cleaning of roadside ditch/catchment areas will occur at several cut slope locations. Schedule A includes 14.95 miles of the described work, Option X includes 2.67 miles of the described work, and Option Y includes replacement of bridge barrier rail on 5 bridges on Ice House Road.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/0283283941044110bc0d9fb4abdfa0c0/view)
 
Place of Performance
Address: Pollock Pines, CA, USA
Country: USA
 
Record
SN06894485-F 20231129/231127230043 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.