Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 29, 2023 SAM #8037
SOLICITATION NOTICE

Y -- CONSTRUCT 35TH BRIGADE MULTIFUNCTIONAL WAREHOUSES

Notice Date
11/27/2023 9:41:26 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
W31R ENDIS MIDDLE EAST WINCHESTER VA 22604-1450 USA
 
ZIP Code
22604-1450
 
Solicitation Number
W912ER23R0013
 
Response Due
12/18/2023 7:00:00 AM
 
Archive Date
11/26/2024
 
Point of Contact
Maria Martin, Phone: 540-665-4077, Teliya Stevenson, Phone: 5406653696
 
E-Mail Address
Maria.L.Martin@usace.army.mil, teliya.j.stevenson@usace.army.mil
(Maria.L.Martin@usace.army.mil, teliya.j.stevenson@usace.army.mil)
 
Awardee
null
 
Description
The purpose of Amendment 0003 is to add revised specs and drawings documents as well as extend the proposal due date to 18 December 2023, and change the Bidder Inquiry date to close on 06 December 2023. TAM is issuing a solicitation for Design-Bid-Build (DBB) award for the Construction of new pre-engineered metal building system warehouses located at the 35th Armor Brigade Base, Kuwait. PROJECT SCOPE: The scope of the project consists of the construction of five new warehouses to house 44 Abrams M1A2K tanks and 4 M88 recovery vehicles each. These warehouses include the addition of two administrative office areas, two maintenance bays, a 10 ton crane, and storage for tools and spare parts. Optional pavement and parking are included in the scope for this project. The five new warehouses are identical and will house 218 tanks total. Each warehouse is to be constructed for each of the M1A2K Armored Battalions within the 35th Brigade (2nd, 7th, 8th, 9th, 55th Battalions). Each warehouse is approximately 7,800 square meters consisting of open bay storage areas for the M1A2K tanks, maintenance bays with a bridge crane, and mezzanines with admin office areas for the approximate (50) personnel. The sites will include hardstands for tank maneuvering and inspection purposes. Existing utilities will be extended and rerouted as shown in the design drawings to be connected to the new facilities. Each warehouse will include fire suppression, humidity control, plumbing, electrical, HVAC systems, and communication (data and phone) per the design. The warehouses have electrically operated roll-up doors, with a forklift sized door, and additional fire hydrants as shown in the design. Storm-water drainage features are also included per the design to accommodate the runoff from the new facilities.1. The period of Performance is anticipated to be seven hundred and twenty-three (723) calendar days from Notice to Proceed (NTP) for the entire scope of work.2. The magnitude of the project is between $25 Million and $100 Million. PROPOSAL PROCEDURES: The Request for Proposal (RFP) will be issued on SAM.GOV. It is anticipated that the Best Value Trade-Off (BVTO) contracting method will be used to evaluate proposals. Evaluation criteria will be stated in the RFP. RESPONSE PERIOD: This is a pre-solicitation notice and is not a request for proposal (RFP) nor does it restrict the Government as to the ultimate acquisition approach. A response to this notice is not required. The Government will not reimburse respondents for any costs incurred in preparation of a response to this notice. Questions can be sent to Maria Martin, e-mail: Maria.L.Martin@usace.army.mil and Teliya Stevenson, e-mail: Teliya.J.Stevenson@usace.army.mil.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/77d35f9d4c534e0387b59641a3318b87/view)
 
Record
SN06894492-F 20231129/231127230043 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.