SOLICITATION NOTICE
Y -- Residential Bathroom Renovation and Remodel
- Notice Date
- 11/29/2023 12:03:26 AM
- Notice Type
- Presolicitation
- Contracting Office
- U.S. EMBASSY STOCKHOLM WASHINGTON DC 20520 USA
- ZIP Code
- 20520
- Solicitation Number
- 19SW8024Q0002
- Response Due
- 12/5/2023 7:00:00 AM
- Archive Date
- 12/05/2023
- Point of Contact
- Jenny Borglin, Jenny Borglin
- E-Mail Address
-
stkgsocontracts@state.gov, BorglinJ@state.gov
(stkgsocontracts@state.gov, BorglinJ@state.gov)
- Description
- Description of Scope: The property is a single-family residence in the Stockholm area on three (3) levels. The house has five (5) bedrooms and currently only one (1) full bathroom on the upper floor and a toilet room on the entry floor. The remodel will improve and increase the bathroom facilities and provide three (3) bathrooms for the five (5) available bedrooms. The proposed project is a full renovation, including replacement of existing finishes or upgrade of existing finishes, and remodel of existing bathroom and toilet room and reconfiguration of space to create an additional new bathroom at the residence The bathroom remodel minimizes the impact to the existing house and utilize as much as possible of the existing layout and architectural configuration as well as existing MEP connection and utilities. To provide the proposed additional bathrooms the entry level restroom is reconfigured to allow for a shower with minimum demolition required and utilizing all existing utilities. The MEP utility modification work required is easily accessed from the house boiler room just below the bathroom. On the upper level the existing bathroom is divided into two (2), creating a master suite and shared bathroom for the remaining two (2) bedrooms. Here, also, the design minimize impact, with limited demolition. The remodel utilizes all existing utilities and connections except for the addition of a new sewer line and exhaust vent. The project includes all new bathroom finishes, wall tile and floor tile and installation of an under the floor heat system. The bathrooms will have all new plumbing fixtures, faucets, and accessories. All new casework, mirrors, and lighting fixtures. The reconfigured bathroom layout and lighting upgrades requires adjustments to the existing circuits, switch, and outlet locations. As well as adjustment to the current plumbing and drain lines. Demolition, and new wall framing work is required as part of the remodeling scope. In addition to the bathroom scope this project also include painting of walls and floors in the one car garage and replacing a few doors on the lower level.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/72d666fd4e624503898051d6e1c046de/view)
- Place of Performance
- Address: Stockholm , SE-AB, SWE
- Country: SWE
- Country: SWE
- Record
- SN06897544-F 20231201/231129230055 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |