Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF DECEMBER 07, 2023 SAM #8045
MODIFICATION

Z -- 666-24-122 B64 Converted to Wireless Thermostats

Notice Date
12/5/2023 10:43:35 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
NETWORK CONTRACT OFFICE 19 (36C259) Greenwood Village CO 80111 USA
 
ZIP Code
80111
 
Solicitation Number
36C25924Q0041
 
Response Due
12/29/2023 10:00:00 AM
 
Archive Date
04/06/2024
 
Point of Contact
Sylwia S Zak (CS), Contracting Specialist
 
E-Mail Address
Sylwia.Zak@va.gov
(Sylwia.Zak@va.gov)
 
Awardee
null
 
Description
SCOPE OF WORK Building 64 Converted to Wireless Thermostats Project # 666-24-122 VA Medical Center, Sheridan, WY INTRODUCTION: The Sheridan VA Medical Center (VAMC) has a need to replace the existing HVAC temperature sensors in Building 64. The existing wired sensors are commonly located behind furniture and do not adequately sense the temperature in the spaces they control. The VAMC needs to replace the existing sensors with wireless sensors that can be located properly in the space to provide proper temperature sensing and regulation for each space. This project is on station at the Sheridan VAMC located at 1898 Fort Road, Sheridan, Wyoming. STATEMENT OF WORK Refer to the contract drawings for specific items to be included. Mainly, the work includes providing and installing wireless thermostats in designated rooms of Building 64. Base bid shall be the price for all the work indicated in the plans and specifications. B. Deductive alternates: The Government may or may not determine it necessary to remove certain identified alternates. These alternates are proposal options under the Federal Acquisition Regulation (FAR) for the Government to exercise at the Government s sole discretion. The Government may exercise all, none or a selection of these options at its discretion, as is the Government s right. There is no required order for acceptance of the options. The evaluation of price will be in accordance with (IAW) FAR 525-217-3 Evaluation Exclusive of Options. D. Deductive alternate no.1: There is no deductive alternate for this project. Performance Period: Upon receiving the Notice to Proceed (NTP) the contractor shall contact the COR to arrange a kickoff meeting and site visit. After NTP the construction period shall be no longer than 30 calendar days. Codes: All work shall be provided in accordance with the most current edition of the following criteria: Contract drawings. Contract specifications. VA Design and Construction Procedures. Most current version of National Fire Protection Association Codes including NFPA 99 Occupational Safety and Health Administration (OSHA) standards. International Mechanical Code. End of Statement of Work
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/7d8ba20c40ac4e39aee3018b32cf6add/view)
 
Record
SN06902438-F 20231207/231205230045 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.