Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 07, 2024 SAM #8136
SPECIAL NOTICE

B -- B-21 East Alert Apron - PLA

Notice Date
3/5/2024 8:36:14 AM
 
Notice Type
Special Notice
 
Contracting Office
W071 ENDIST OMAHA OMAHA NE 68102-4901 USA
 
ZIP Code
68102-4901
 
Solicitation Number
w9128f24SM010
 
Response Due
4/5/2024 12:00:00 AM
 
Archive Date
12/31/2024
 
Point of Contact
Michele Renkema, Brittany Gull
 
E-Mail Address
michele.a.renkema@usace.army.mil, brittany.c.gull@usace.army.mil
(michele.a.renkema@usace.army.mil, brittany.c.gull@usace.army.mil)
 
Description
PLA Sources Sought number: W9128F24SM010 The U.S. Army Corps of Engineers Omaha District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLA) for a large-scale construction project with a construction magnitude between $25M and $100M for the B-21: East Alert Apron, Ellsworth Air Force Base (EAFB), South Dakota (SD). Email your responses no later than 2:00 PM central time on 5 April 2024 to michele.a.renkema@usace.army.mil and courtesy copy amanda.e.eaton@usace.army.mil and brittany.c.gull@usace.army.mil. Ensure your response is limited to 5 pages and the Subject Line of your response includes the Notice Identification Number W9128F24SM010. Please provide your contact information in the body of the email. A PLA is defined as a pre-hire collective bargaining agreement between a Prime contractor and one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S. C. 158(f). Federal Acquisition Regulation (FAR 22.503) Policy provides that: (a) Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects. (b) An agency may, if appropriate, require that every contractor and subcontractor, or certain subcontractors, engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will: (i) Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards and other matters; and (ii) Be consistent with law. Reference: FAR 52.222-33 Notice of Requirement for Project Labor Agreement; FAR 52.222-34 Project Labor Agreement. � Request responses to the following questions: (1) Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation. (2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the reference project? If so, please elaborate and provide supporting documentation where possible. � (3) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible. � (4) Identify specific reasons why or how you believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. � (5) Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. � (6) Identify any additional information you believe should be considered on the use of a PLA on the referenced project. � (7) Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project. (8) Will the inclusion of the PLA requirement affect industry proposal submission timeliness? Please provide anticipated time required to draft and include a PLA with a proposal package. � The information gathered in this survey should include the following information on projects completed in the last 2 � 5 years: Project Name and Location Detailed Project Description Initial Cost Estimate vs. Actual Final Cost Was the project completed on time? Number of craft trades present on the project Was a PLA used? Were there any challenges experienced during the project? Project Description: This upcoming solicitation will be executed using a design-bid-build (DBB) project delivery method, which will require the contractor to provide the Government with a complete facility and warranty based on the Request for Proposal (RFP). This project will provide four (4) new pre-engineered metal Environmental Protection Shelters (EPS), approximately 20,000 SF each. EPSs are sized to fit the B-2A �Spirit� aircraft with space to perform general aircraft maintenance. The project also includes associated airfield and ground support equipment (GSE) paving. Supporting facilities include two (2) maintenance kiosks, approximately 160 SF each, providing electrical and communication infrastructure to the EPSs. Additional site features include blast deflectors, PL-3 boundary fencing and lighting, and an entry control point (ECP). This project will include a space or spaces constructed to AFI 16-1404 requirements. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. Each facility must be compatible with applicable DoD, Air Force, aircraft, and base design standards. In addition, sustainable (green) construction materials and techniques shall be used where cost effective and/or where specified. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. Special construction and functional requirements: The project will be constructed on / near the existing Alert Apron at EAFB. As such, the project will be constructed adjacent to � and may be required to integrate with active airfield operations. It will also be constructed adjacent to other active B-21 facility construction sites. Demolition of existing facilities, utilities, and infrastructure to include hazardous materials contaminated apron and soils may be required. New airfield apron will be designed in compliance with UFC 3-260-02 and will be constructed in compliance with UFGS 32 13 14.13. The estimated magnitude of construction cost of this project is between $25,000,000 and $100,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/653a82f1737b466689ac76dae824fb04/view)
 
Place of Performance
Address: Ellsworth AFB, SD, USA
Country: USA
 
Record
SN06985589-F 20240307/240305230048 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.