Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 10, 2024 SAM #8139
SOLICITATION NOTICE

Z -- Pipeline Recreation Site Improvements

Notice Date
3/8/2024 9:09:28 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
USDA-FS, CSA SOUTHWEST 7 Albuquerque NM 871023498 USA
 
ZIP Code
871023498
 
Solicitation Number
127EAX24R0006
 
Response Due
3/26/2024 2:00:00 PM
 
Archive Date
04/10/2024
 
Point of Contact
Brenda Simmons
 
E-Mail Address
brenda.simmons@usda.gov
(brenda.simmons@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Advance Amendment Notice An amendment will will be posted. This notice to solicitation 127EAX24R0006, Pipeline OHV Staging Area is to provide answers to the questions received and make corrections to the SF1442.: Block # 11 is changed to say, The Contractor shall begin performance with 10 calendar days and complete it within 60 calendar days after receiving Notice to Proceed. Block # 12a is changed to state the Contractor must furnish required Performance and Payments Bonds 10 calendar days after award. Block 13b is changed to read an offer guarantee is required. QUESTIONS AND ANSWERS The Documents for the Prevailing wage requirements, does not list welder, what would the welder fall under? On page # 3 is says the following: Welders - Receive rate prescribed for craft performing operation to which welding is incidental. � For the railing - How do we complete the corners?� Would we put an Expansion Break point at each corner? Would we install a Safety Turndown at each corner?� For the railing - install a Safety Turndown at each corner. � Do the two green circles on the attached represent the driveway openings? On the USDA_FS_MonumentFireCenter_Title1_20240304_Rev01 document, the two green circles represent the Driveway openings. � Is a Bid Bond required? A 100% payment and performance bonds are required to be submitted. A 20% bid bond guarantee will be required. � There is no mention of a determined date and time of a job site walk, will there be one? The site visit is scheduled for March 12th at 10:00 a.m. The location is as follows: Meet at Eastern side of the Globe Ranger District, OHV Pipeline, Globe, AZ 85501. Approximately at the southwest corner of the intersection of SR-70 and SR-77. Point of Contact: Kossigan Apedjinou, 480-973-0553, kossigan.apedjinou@usda.gov. AN OFFICIAL AMENDMENT WILL FOLLOW END OF NOTICE ORIGINAL POSTING BELOW The U.S. Forest Service is soliciting offers for a single award, Firm-Fixed Price contract type with an estimated magnitude for the base and options between $500,000 and $1,000,000. The Government anticipates awarding a single contract for Pipeline Recreation Site Improvements in Gila County, Arizona.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/9d4f3d7d56d14b57ae74a8615a6561bf/view)
 
Place of Performance
Address: Globe, AZ, USA
Country: USA
 
Record
SN06990862-F 20240310/240308230107 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.