Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 15, 2024 SAM #8144
SOLICITATION NOTICE

Z -- Roofing Requirements Contract

Notice Date
3/13/2024 5:43:53 AM
 
Notice Type
Solicitation
 
NAICS
238160 — Roofing Contractors
 
Contracting Office
W6QM MICC-FT DRUM FORT DRUM NY 13602-5220 USA
 
ZIP Code
13602-5220
 
Solicitation Number
W911S224B8300
 
Response Due
3/20/2024 11:00:00 AM
 
Archive Date
04/18/2024
 
Point of Contact
Samara Johnson, Phone: 3157725247, Jeffrey Getman, Phone: 3157729074
 
E-Mail Address
samara.e.johnson.civ@army.mil, jeffrey.m.getman.civ@army.mil
(samara.e.johnson.civ@army.mil, jeffrey.m.getman.civ@army.mil)
 
Small Business Set-Aside
HZC Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
 
Awardee
null
 
Description
ATTENTION BIDDERS: Amendment attachments are accessed by clicking ""PIEE Solicitation Module Link for W911S224B8300"" within the ""Attachments/Links"" section of the SAM.gov posting. That link will take you to the PIEE solicitation module. Click ""Download All Attachments"" button to download a compressed (zipped) folder; solicitation amendment and revised documents will be in a subfolder named �0001�. The Contractor shall provide all supervision, plant, labor, equipment, materials and appliances necessary to perform all operations in connection with the repair and replacement of existing roofs on various building structures located at Fort Drum, in accordance with this Statement of Work, specifications and drawings, and subject to the terms and conditions of the contract. Completed work shall result in each building or facility being watertight and impervious to the weather and its elements. All work shall be completed by personnel skilled in the type of work involved. When new work adjoins, connects or abuts existing work or facilities, the existing work or facilities shall be altered as required and the connections made in an approved, workmanlike and professional manner. All existing work or facilities damaged by the Contractor?s operations, other than facilities specified to be removed in a task order, shall be repaired or replaced by the Contractor at no cost to the Government. Prior to performance of any work, a preconstruction orientation shall be held at Fort Drum unless waived by the Government. The Contractor shall have a representative attend who has authority to make decisions for and sign contractual documents on behalf of the Contractor.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/e3b7ec7bd73a4f108db1ab54bd23e06d/view)
 
Record
SN06995444-F 20240315/240313230045 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.