SPECIAL NOTICE
J -- WATERFRONT AND ALTERATION INSTALLATION TEAM (AIT) SERVICES SUPPORT TO THE MARITIME ELECTROMAGNETIC WARFARE DIVISION
- Notice Date
- 3/18/2024 12:53:15 PM
- Notice Type
- Special Notice
- NAICS
- 336611
— Ship Building and Repairing
- Contracting Office
- NSWC CRANE CRANE IN 47522-5001 USA
- ZIP Code
- 47522-5001
- Solicitation Number
- N0016424SNB50
- Response Due
- 3/25/2024 1:00:00 PM
- Archive Date
- 04/09/2024
- Point of Contact
- Seth Swartzentruber
- E-Mail Address
-
seth.a.swartzentruber.civ@us.navy.mil
(seth.a.swartzentruber.civ@us.navy.mil)
- Description
- N0016424RWM44 � WATERFRONT AND ALTERATION INSTALLATION TEAM (AIT) SERVICES SUPPORT TO THE MARITIME ELECTROMAGNETIC WARFARE DIVISION- PSC J020 - NAICS 336611 Issue Date: 18 March 2024 This is notification of Naval Surface Warfare Center, Crane Division, Crane, IN, intent to consolidate the Waterfront Operations Support and Alteration Installation Team (AIT) Services currently being procured under Task Order�s (TO�s) N0016418F3006, N0016418F3007, and FA807521F0062. Seaport Task Order No. N00178-04-D-4119/N0016418F3006. This task order provides Engineering, Logistics, Technical, and Programmatic Support Services to achieve and sustain Affordable System Operational Effectiveness (ASOE) as well as support AN/SLQ-32 improvements, fielded AN/SLQ-32(V)6, AN/SLQ-32(V)7, SLQ-59, SLQ-62, and AN/ALQ-24. Seaport Task Order No. N00178-04-D-4146/N0016418F3007. This task order provides operation and field support for Program Executive Office IWS 2, Legacy SLQ-32, NULKA, MK-53, MK-59, and MK-234, and 18F3006 provides operation and field support for AN/SLQ-32(V)6 and beyond, along with AOEW and SLQ-59 systems. Department of Defense Information Analysis Centers (DoD IAC) Task Order No. FA807518D0014/FA807521F0062. This task order provides technical, logistics, and programmatic services in support of FMP installs. This consolidation requirement will be competed as a small-business set-aside solicited through the System for Award Management (SAM). The requirement will consist of approximately 41 Full-Time Equivalents (FTE�s) or 393,202 labor hours over the life of the contract. The Period of Performance (PoP) applicable to the subject procurement will be a one (1) year base and four (4) one year options. NSWC Crane has determined that measurably substantial benefits are expected to be derived as a result of the bundling as defined at FAR 7.107. The expected benefits of this bundling action are listed in FAR 7.107-3 and summarized below: 1) Cost Savings 2) Quality improvements that will save time or improve or enhance performance or efficiency 3) Reduction in acquisition cycle times
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/4203becdcc32455fb60fe5aa05ec7b40/view)
- Record
- SN07000010-F 20240320/240318230044 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |