Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 14, 2024 SAM #8174
SPECIAL NOTICE

Z -- NOTICE OF INTENT TO AWARD MODIFICATION FOR LINCOLN HALL RENOVATION, BLDG. 607

Notice Date
4/12/2024 11:00:17 AM
 
Notice Type
Special Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
W2SD ENDIST NEW YORK NEW YORK NY 10278-0004 USA
 
ZIP Code
10278-0004
 
Solicitation Number
W912DS24S0040
 
Response Due
4/27/2024 9:00:00 AM
 
Archive Date
05/12/2024
 
Point of Contact
Adrian Stafford-Browne, Phone: 9177908087, Nicholas P. Emanuel, Phone: 9177908069
 
E-Mail Address
adrian.j.stafford-browne@usace.army.mil, nicholas.p.emanuel@usace.army.mil
(adrian.j.stafford-browne@usace.army.mil, nicholas.p.emanuel@usace.army.mil)
 
Description
1. This notice of intent announcement is to: � � � � A. Notify potential offerors of the Government�s intent to modify contract W912DS23C0025, Lincoln Hall Renovation, Bldg. 607, to include installation of the following items: Cellular Distributed Antenna System Wireless Access Points Outside Plant Fiber � � � � B. Notify potential offerors of the Government�s intent to modify the construction contract as described below. Install cellular distributed antenna system (estimated cost = $325,000) Install wireless access point system (estimated cost = $41,000) Install outside plant fiber and telecommunication cables (estimated cost = $130,000) The requirement is to award modifications to the construction contract to include all work associated with installation of the cellular distributed antenna system (cDAS), wireless access points (WAP), and outside plant fiber in support of the Lincoln Hall Renovation project. The work associated with installation of the cDAS includes head-end equipment, cabling, devices, integration and testing as detailed in the telecommunication plans and specifications associated with the Lincoln Hall Renovation project through C-Squared per the approved sole source justification. The Lincoln Hall Renovation contract includes installation of pathways and conduit and will not be included in this modification.� The work associated with installation of the WAP system includes head-end equipment, cabling, devices, amplifiers as detailed in the telecommunication plans and specifications associated with the Lincoln Hall Renovation project. The Lincoln Hall Renovation contract includes installation of pathways and conduit and will not be included in this modification.� Equipment that is existing to be relocated or new equipment will be provided by the Government and installed by the Lincoln Hall Renovation contractor. The work associated with the installation of the outside plant fiber includes installing fiber in support of the Television Studio that will be located in Lincoln Hall from Building 600 as detailed in the telecommunication contract documents associated with the Lincoln Hall Renovation project. Other outside plant fiber work in support of Lincoln Hall includes extending from telecommunication installed during the Cullum Hall (Building 600) project as well as splicing existing lines and installing new exterior lines. This outside plant work is required during the demolition of the Lincoln Hall construction project to minimize impacts to service at adjacent buildings. Coordination is required with other Government agency for installation of new fiber prior to demolition of the existing fiber terminated within Lincoln Hall. �The work includes verifying existing cable lengths and providing necessary equipment required to re-install or splice cables with connector modules to the proper terminations. Existing conduit will be inspected and if found to be in good condition, will be reused. There may be locations where conduit will need to be repaired or replaced as necessary. This work was originally included in the Lincoln Hall Renovation solicitation and resulting contract as optional work, but the options were not exercised due to a lack of available funding at the time.� Funding is now available to perform this work. The Government intends to award these items of work as construction modifications to the contract W912DS23C0025 contractor. Installation of these systems is required during performance of the Lincoln Hall Renovation construction project to minimize impacts to operations at the United States Military Academy. Modifications to the existing Lincoln Hall contract are beneficial to the Government because the Lincoln Hall contractor is familiar with the Lincoln Hall Renovation contract. The Lincoln Hall construction contractor currently has supervisors and administrative staff onsite overseeing other contract work as well as dedicated laydown areas established within the work area. Awarding this work to a new contractor would be cost prohibitive to the Government because a separate contractor would be required to coordinate with an active construction project and within an active construction site, as well as provide additional overhead and storage/laydown. Any vendor wishing to propose a capabilities statement must provide a copy of all relevant data demonstrating that they can satisfy the above requirements, by the required due date and time, to Adrian.J.Stafford-Browne@usace.army.mil.� �This is not a request to respond to a solicitation.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/8af5c561fffe4b3faddfba35bb8c9388/view)
 
Place of Performance
Address: West Point, NY, USA
Country: USA
 
Record
SN07028683-F 20240414/240412230041 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.