Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 03, 2024 SAM #8193
SOLICITATION NOTICE

R -- JTF GTMO Camp System _ OLIVE

Notice Date
5/1/2024 8:37:39 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
541613 — Marketing Consulting Services
 
Contracting Office
0410 AQ HQ CONTRACT DORAL FL 33172-1202 USA
 
ZIP Code
33172-1202
 
Solicitation Number
PAN41024P0000000341
 
Response Due
5/3/2024 7:00:00 AM
 
Archive Date
05/18/2024
 
Point of Contact
Dyan E. Jackson, Phone: 3054372661, Sherwin Riley, Phone: 3054371811
 
E-Mail Address
dyan.e.jackson.civ@mail.mil, sherwin.d.riley.civ@mail.mil
(dyan.e.jackson.civ@mail.mil, sherwin.d.riley.civ@mail.mil)
 
Small Business Set-Aside
8AN 8(a) Sole Source (FAR 19.8)
 
Description
SPECIAL NOTICE:� THIS IS A SOLE SOURCE REQUIREMENT The contractor shall provide all personnel, equipment, tools, supervision, and other items and services necessary to complete a site survey to identify what is required to integrate and maintain the OLIVE system within the JTF J2 IT systems environment at the United States Naval Base Guantanamo Bay (GTMO), CUBA, in accordance with the unique mission requirements. Pre-Site Survey: The contractor shall coordinate directly with the J21-GTMO team of the United States Southern Command.��Pre-Site Survey (continued): The contractor shall participate in meetings with the J21 GTMO Program Director, Mr. Chris Bridges.� These meetings shall be conducted on both classified and unclassified communication platforms.�� The contractor shall possess the capability to meet virtually in all classification levels up to Top Secret / SCI.� Site Survey: The contractor shall report to the GTMO OCONUS work location, survey the physical, environmental (cooling), power, technical (network, hardware, software, data storage), maintenance, support, and staffing requirements to integrate and maintain an OLIVE system to ingest existing Collection sources and process using OLIVE�s analytic capabilities, alerting, and data storage. The contractor shall travel to the work location the day prior to beginning the site survey, complete the survey across the next two working days and depart the work location the following day or later, at the next availability of government provided transportation depending on government needs and travel availability. Post Site Survey:� The contractor shall furnish two products to the government.� The first product shall consist of the following: 1.) a feasibility study on implementation of OLIVE system integration 2.) an analysis and presentation of various solution course of actions (COA�s).� The second product shall be a detail rough order of magnitude (ROM), of the various costs by time and materials of each COA from the first deliverable.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/02aad85f036b4dcebfc90f74ffb11c43/view)
 
Place of Performance
Address: N/A, AX2
Country: AX2
 
Record
SN07048244-F 20240503/240501230037 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.