Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 05, 2024 SAM #8195
SOLICITATION NOTICE

Z -- Presolicitation Notice - Touchdown 26 Replacement - Kingdom of Jordan

Notice Date
5/3/2024 8:45:43 AM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
W31R ENDIS MIDDLE EAST WINCHESTER VA 22604-1450 USA
 
ZIP Code
22604-1450
 
Solicitation Number
W912ER24R0012
 
Response Due
5/18/2024 1:00:00 PM
 
Archive Date
06/02/2024
 
Point of Contact
Andrew Brown, Phone: 5406656523, Christina R.W. Loy, Phone: 5406653689
 
E-Mail Address
andrew.j.brown@usace.army.mil, christina.w.loy@usace.army.mil
(andrew.j.brown@usace.army.mil, christina.w.loy@usace.army.mil)
 
Description
The U.S. Army Corps of Engineers (USACE), through its Transatlantic Division (TAD), Transatlantic Middle East District (TAM), anticipates soliciting and awarding a contract to provide the necessary construction services as described below. The project site is located at undisclosed location approximately 100km East of Amman, Jordan. This will be a firm-fixed price (FFP) Design-Bid-Build (DBB) contract awarded on the basis of full and open competition in accordance with Federal Acquisition Regulation (FAR) Part 15 - Contracting by Negotiation and FAR Part 36 - Construction and Architect Engineer Contracts. No reimbursement will be made for any costs associated with providing information in response to this forthcoming Solicitation or any follow up information requests.� TAM is evaluating the ability of businesses to perform a comprehensive pavement repair by removal of 14,807SM of Portland Cement Concrete (PCC) pavement, to include transitions, and replace with modified-heavy load concrete pavement on the Touchdown 26 end of Runway 08/26. Pavement will support medium load aircraft landing operations. Repair shall include concrete extension of the touchdown zone to meet current mission-assigned platform requirements by replacing 8,412SM of asphaltic concrete pavement of runway with PCC. Additionally, repair by replacement of threshold lighting infrastructure and those taxiway�s exit lighting infrastructure that are within the concrete touchdown. Work will include all necessary airfield markings on the touchdown zone. This project will comply with applicable DoD, Air Force, and base design standards. Magnitude of Construction: The total contract dollar value for the base and options will be estimated between $5 million and $10 million. Performance Period: The anticipated period of performance is 310 calendar days.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/4b5b54fb4e9d40908b9c7ed16f886d24/view)
 
Place of Performance
Address: JOR
Country: JOR
 
Record
SN07052816-F 20240505/240503230039 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.