Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 24, 2024 SAM #8214
SOLICITATION NOTICE

43 -- W519TC-24-Q-2009 DRS MWMSS IDIQ AIR COMPRESSOR Solicitation

Notice Date
5/22/2024 12:27:06 PM
 
Notice Type
Solicitation
 
NAICS
333912 — Air and Gas Compressor Manufacturing
 
Contracting Office
W6QK ACC-RI ROCK ISLAND IL 61299-0000 USA
 
ZIP Code
61299-0000
 
Solicitation Number
W519TC-24-Q-2009
 
Response Due
6/7/2024 8:00:00 AM
 
Archive Date
06/22/2024
 
Point of Contact
Sophia Muckenfuss, Cathy K. Mendoza
 
E-Mail Address
SOPHIA.L.MUCKENFUSS.CIV@ARMY.MIL, cathy.k.mendoza.civ@army.mil
(SOPHIA.L.MUCKENFUSS.CIV@ARMY.MIL, cathy.k.mendoza.civ@army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
See Attachments. Q&A: 1. �Do you know what your overall flow demand is as measured in CFM?� - Minimum 25 SCFM @145 PSI 2. What is the application of the air? (What�is it used for?)� - General shop use, including air tools, CNC mill, CNC lathe, and plasma cutter. 3. Will this application need a continuous supply or air, or intermittent? - The air compressor will be paired with a relatively small 20 gallon air tank, so near continuous supply. 4. What is your maximum psi needed? - 145 PSI Minimum output. 5. What are your power requirements for this unit? (Voltage, Phase) - 208 Volt, 60 Hertz, 3 Phase with a Max Amperage draw of 16. 6. �Is there existing equipment? If so, what are the specs on it? (hp, cfm, psi, rpms,�etc.). - The suggested source of supply that�s currently used in production is listed on the drawing. Manufacturer: Anchor Werther (Werther International), Part Number: 168711 (Silver 7.5). 7.�What is your timeline for having equipment in place?� - This is a Base IDIQ so once Awarded a DO (Delivery Order) will be issues within 30 days and at that time the amont ordered under that DO will have a delivery date.� 8. Will this equipment be located inside or outside? - Inside. 9. What is the location where the equipment will be used? - The air compressors will be installed inside mobile Metalworking and Machining Shop Sets produced by JMTC and fielded to soldiers. 10. Do you currently have the additional equipment needed to achieve clean, dry air? - Yes, the final system includes a pair of particulate and coalescing filters. 11. Is there a requirement for the service and�maintenance of�your new compressors once installed? - No, soldiers in the field will be operating and maintaining the compressors.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/3370682e2acf43ad9141d9a95dfdb8c2/view)
 
Place of Performance
Address: Rock Island, IL 61299, USA
Zip Code: 61299
Country: USA
 
Record
SN07073648-F 20240524/240522230048 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.