Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 07, 2024 SAM #8228
SOLICITATION NOTICE

96 -- Fermilab - Daycare Center Crawl Space Supports

Notice Date
6/5/2024 11:22:55 AM
 
Notice Type
Solicitation
 
NAICS
238120 — Structural Steel and Precast Concrete Contractors
 
Contracting Office
FERMILAB - DOE CONTRACTOR Batavia IL 60510 USA
 
ZIP Code
60510
 
Solicitation Number
ISD-357300-RK
 
Response Due
7/16/2024 1:00:00 PM
 
Archive Date
07/31/2024
 
Point of Contact
Richard Konan, Phone: 6308402835
 
E-Mail Address
rkonan@fnal.gov
(rkonan@fnal.gov)
 
Description
1.0 INTRODUCTION AND BACKGROUND Fermilab is requesting a proposal for removal and replacement of crawl space jack posts, demolition of existing concrete footings, and installation of new footings at the Daycare Center building. The existing jack posts are in various stages of deterioration and require replacement. Additionally, the existing footings are undersized and new footings are required. 2.0 SCOPE Provide all work as shown on : ? Drawing set for ISD Project 10-2-153 ? Specification Sections: 010010 GENERAL REQUIREMENTS 013100 ENVIRONMENT, SAFETY, AND HEALTH REQUIREMENTS 013300 SUBMITTALS 014100 QUALITY REQUIREMENTS The Subcontractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings and technical specifications. The Subcontractor�s scope of work is not limited to the general work outline described herein. The Subcontractor shall perform all work required to complete the construction work in accordance with the drawings and/or specifications. The description and quantities listed are general in nature and are only intended to describe the range and complexity of this scope of work. The description and quantities provided below are not to be used as the basis for establishing a cost proposal. Specific quantities and definitions of the scope of work for providing a proposal shall be based solely on estimates developed by the Offer from the drawings, specifications, and the information obtained from examining of the project site. Confined space training is required for work in the crawl spaces. 3.0 DELIVERABLES The Subcontractor shall perform all work required to complete the construction work in accordance with the drawings and specifications. 4.0 QUALITY ASSURANCE A Fermilab Construction Coordinator will be assigned to this project. See Specification Section 010010, GENERAL REQUIREMENTS. The Subcontractor is responsible for all activities necessary to manage, control, and document that work complies with the Subcontract documents. The Subcontractor�s responsibility includes ensuring adequate Quality Control services are provided for work accomplished on- and off-site by his/her organization,�suppliers, sub-tier contractors, technical laboratories, and consultants. A Quality Control Plan is required (see Specification 014100). 5.0 GOVERNMENT-FURNISHED PROPERTY There will be no materials or equipment furnished by FRA. 6.0 SECURITY All personnel working at Fermilab are required to provide Real ID and obtain badging from the Fermilab Badging Office. Compliance with the Fermilab COVID 19 requirements in effect at the time the work is performed is mandatory. 7.0 PLACE OF PERFORMANCE The work will be performed at the Daycare Center building. Refer to the drawings for the specific location. 8.0 SCHEDULE This project includes the following milestones: 1. Milestone 0 � 0 Calendar Days - NTP, This milestone marks the point where construction work may begin. 2. Milestone 1 � 14 Calendar Days � All material submittals complete. 3. Milestone 2 � 90 Calendar Days � Construction complete with punch-list items remaining. 4. Milestone 3 � 120 Calendar Days � Project Complete. The Notice To Proceed (NTP) represents the basis of the start of the project duration. The Project Complete milestone marks the completion of the project including punch list items, clean-up and acceptance of as-built drawings and if required, submittals. A cost loaded schedule, submitted to the Fermilab Construction Coordinator, is required prior to starting work.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d98929649a9f4b779237afb3e1e5427d/view)
 
Place of Performance
Address: Batavia, IL 60510, USA
Zip Code: 60510
Country: USA
 
Record
SN07087675-F 20240607/240605230119 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.