SOLICITATION NOTICE

Y -- AIT Complex Phase IV Headquarters Building Construction Project, Fort Eustis; Virginia.

Notice Date
6/14/2024 10:22:56 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
W2SD ENDIST NORFOLK NORFOLK VA 23510-1096 USA
 
ZIP Code
23510-1096
 
Solicitation Number
W9123624B2014
 
Response Due
6/20/2024 11:00:00 AM
 
Archive Date
01/01/2025
 
Point of Contact
Jacob Coody, Phone: 757-201-7814, Katya Oxley, Phone: 7572017026
 
E-Mail Address
jacob.w.coody@usace.army.mil, ekaterina.oxley@usace.army.mil
(jacob.w.coody@usace.army.mil, ekaterina.oxley@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
Amendment 0006: Issued to provide ProjNet Inquiries and Responses and revised attachment. Amendment 0005: Issued to revise the Wage Determination and provide revised attachments, which are related to answers provided in ProjNet. Amendment 0004: Issued to extend bid due date and bid opening date. Amendment 0003: Issued to provide scalable drawings. The Norfolk District, Corps of Engineers is procuring a firm-fixed-price contract for the AIT Complex Phase IV Headquarters Building Construction Project at Fort Eustis (Joint Base Langley Eustis); Virginia. The work will include construction of a standard design Battalion Headquarters Building (10,900 SF) and a standard design Brigade Headquarters Building (9,450 SF), both being single story facilities. Construction includes: special foundation, fire protection and alarm systems and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage, and site improvements. Heating and air conditioning will be provided by self-contained systems. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. The project will provide a building that will be safe to personnel, protect mission critical assets and comply with current design criteria and all applicable codes. All utility connection work required by the contract documents will need to be coordinated with the Privatized Utility Providers at JBLE-Eustis.In accordance with FAR 36.205, the statutory cost limitation for AIT Complex Phase IV Headquarters Building Construction Project is $16,000,000.00. This amount applies to CLINs 0001 through 0004. The Government shall reject an offer if its prices exceed applicable statutory limitations, unless laws or agency procedures provide pertinent exemptions. If in the Government?s interest, the contracting officer reserves the right to award of separate contracts for individual items whose prices are within or subject to applicable statutory limitations.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/332330c8bfd64d739915caa86ce28e78/view)
 
Record
SN07098134-F 20240616/240614230124 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.