Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 19, 2024 SAM #8240
SOLICITATION NOTICE

Z -- Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements

Notice Date
6/17/2024 1:44:17 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W074 ENDIST SAVANNAH SAVANNAH GA 31401-3604 USA
 
ZIP Code
31401-3604
 
Solicitation Number
W912HN24B5004
 
Response Due
7/17/2024 9:00:00 AM
 
Archive Date
06/17/2025
 
Point of Contact
Amy Collins, Phone: 9126525505, Glenda Canty, Phone: 912-652-5030
 
E-Mail Address
amy.l.collins@usace.army.mil, glenda.a.canty@usace.army.mil
(amy.l.collins@usace.army.mil, glenda.a.canty@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
Amendment 0001 to include a site visit on 20 June 2024 at 10:00 am. Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements - The existing back dike currently spans a length of approximately 11,000 feet and has a crest elevation ranging from about 27 to 29 feet mean lower low water (MLLW). The back dike will be raised to a uniform elevation of 33 feet MLLW. The existing front dike currently spans a length of approximately 6,400 feet and has a crest elevation ranging from about 25 to 27 feet MLLW. The front dike will be raised to a uniform elevation of 31 feet MLLW to gain additional capacity for containment of Savannah Harbor dredged material. Approximately 231,000 cubic yards of borrow material from the adjacent 14B DMCA will be required for the raising of the back dike and approximately 65,000 cubic yards for the front dike. Additional borrow materials from the adjacent 14B DMCA may be needed. Weir modifications for weirs 14A1, 14A2, and 14A3 are anticipated, as well as resetting the abutment on cross-dike weir 14A/B. The borrow material consists of dredge materials from the Savannah River. The dike construction will be performed to the inside of the existing dike crest and slope. Additional project requirements include clearing, grassing, and erosion control provisions.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/a8be0f8aa74546e39eaf4674a0c3679c/view)
 
Record
SN07099488-F 20240619/240617230117 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.