99 -- Green River Lock 1 Miter Gate Rehab

Notice Date
6/17/2024 8:58:37 AM
 
Notice Type
Sources Sought
 
Contracting Office
W072 ENDIST LOUISVILLE LOUISVILLE KY 40202-2230 USA
 
ZIP Code
40202-2230
 
Solicitation Number
W912QR24QGRL1A
 
Response Due
6/30/2024 7:00:00 AM
 
Archive Date
07/15/2024
 
Point of Contact
Ethan Phillips, Phone: 5023156545, Andrew Fleming, Phone: 5023157036
 
E-Mail Address
ethan.s.phillips@usace.army.mil, andrew.j.fleming@usace.army.mil
(ethan.s.phillips@usace.army.mil, andrew.j.fleming@usace.army.mil)
 
Description
Market Survey Questionnaire � Green River Lock 1 Miter Gate Rehab 1. Project Title: Green River Lock 1 Miter Gate Rehab 2. Project Location (with physical address): 5048 DAM & LOCK ROAD REED, KY 42451 3. Project NAICS Code: 237990 4. Response Date: 30 June 2024 5. Short Project Description: The government is currently unable to dewater the chamber, but this� project will require the same floating plant capabilities as a dewatering. Repairs will include� potential install of closure system and maintaining floating plant access throughout the remainder� of the project. Miter gates will need to be completely removed from the chamber by floating crane� and laid down for repairs and government inspection. Mobile cranes will need to be placed across� the chamber to help facilitate reinstallation of anchor arms. The contractor will replace and rehab� related components, to include anchor arms, pintle casting bolts, and diagonals. Another component� to this is to tension the diagonals in the wet after replacement and repair any structural cracking� that is found. Diving will be needed to reinstall the gates onto the pintle balls. 6. Type of Action: Sealed Bid 7. Estimated Advertisement Date: 4?? Quarter FY24 8. Estimated Award Date: 4th Quarter FY24 9. Estimated Performance Period: 430 calendar days 10. Construction Cost Limit (CCL) and Programmed Amount (PA): NOTE: The CCL is the estimated� construction award amount and does not include real estate, S&A, DDC or contingency. CCL: 5.0M PA:� $6.59M 11. Criteria: a. Projects similar in scope will include: Removal and rehabilitation of miter gates or similar� structures in which gates had to be picked up and laid down without assistance of government� furnished floating plant. Projects should include managing a major maintenance project on a major� river system to perform maintenance work. Examples of similar projects in size and scope would be:� Miter Gate Rehabilitations, Miter Gate Exchanges, Tainter Gate Replacements, and Lock Chamber� Dewatering�s without the use of government furnished plant. 12. Based on the definitions above, for each project submitted, include: a. � current percentage of construction complete and the date when it was or will be completed. b. � scope of the project c. � size of the project d. � dollar value of the project e. � the portion and percentage of work that was self-performed 13. Your (PM) contact information: Josh Saylor (joshua.a.saylor@usace.army.mil) 502-315-7331
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/f170e874bc474dc59ddf96ca4837bec6/view)
 
Place of Performance
Address: Reed, KY 42451, USA
Zip Code: 42451
Country: USA
 
Record
SN07100190-F 20240619/240617230122 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.