Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 19, 2024 SAM #8240
SOURCES SOUGHT

99 -- Green River Lock 1 Miter Gate Rehab

Notice Date
6/17/2024 8:19:29 AM
 
Notice Type
Sources Sought
 
Contracting Office
W072 ENDIST LOUISVILLE LOUISVILLE KY 40202-2230 USA
 
ZIP Code
40202-2230
 
Solicitation Number
W912QR24QGRL1A
 
Response Due
6/30/2024 7:00:00 AM
 
Archive Date
07/15/2024
 
Point of Contact
Ethan Phillips, Phone: 5023156545, Andrew Fleming, Phone: 5023157036
 
E-Mail Address
ethan.s.phillips@usace.army.mil, andrew.j.fleming@usace.army.mil
(ethan.s.phillips@usace.army.mil, andrew.j.fleming@usace.army.mil)
 
Description
Market Survey Questionnaire � Green River Lock 1 Miter Gate Rehab 1. Project Title: Green River Lock 1 Miter Gate Rehab 2. Project Location (with physical address): 5048 DAM & LOCK ROAD REED, KY 42451 3. Project NAICS Code: 237990 4. Response Date: 30 June 2024 5. Short Project Description: The government is currently unable to dewater the chamber, but this project will require the same floating plant capabilities as a dewatering. Repairs will include potential install of closure system and maintaining floating plant access throughout the remainder of the project. Miter gates will need to be completely removed from the chamber by floating crane and laid down for repairs and government inspection. Mobile cranes will need to be placed across the chamber to help facilitate reinstallation of anchor arms. The contractor will replace and rehab related components, to include anchor arms, pintle casting bolts, and diagonals. Another component to this is to tension the diagonals in the wet after replacement and repair any structural cracking that is found. Diving will be needed to reinstall the gates onto the pintle balls. 6. Type of Action: Sealed Bid 7. Estimated Advertisement Date: 4th Quarter FY24 8. Estimated Award Date: 4th Quarter FY24 9. Estimated Performance Period: 430 calendar days 10. Construction Cost Limit (CCL) and Programmed Amount (PA): NOTE: The CCL is the estimated construction award amount and does not include real estate, S&A, DDC or contingency. CCL: 5.0M PA: $6.59M 11. Criteria: a. Projects similar in scope will include: Removal and rehabilitation of miter gates or similar structures in which gates had to be picked up and laid down without assistance of government furnished floating plant. Projects should include managing a major maintenance project on a major river system to perform maintenance work. Examples of similar projects in size and scope would be: Miter Gate Rehabilitations, Miter Gate Exchanges, Tainter Gate Replacements, and Lock Chamber Dewatering�s without the use of government furnished plant. 12. Based on the definitions above, for each project submitted, include: a. current percentage of construction complete and the date when it was or will be completed. b. scope of the project c. size of the project d. dollar value of the project e. the portion and percentage of work that was self-performed 13. Your (PM) contact information: Josh Saylor (joshua.a.saylor@usace.army.mil) 502-315-7331
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/af8b6877cc5b4eba882bb808cf35756b/view)
 
Place of Performance
Address: Reed, KY 42451, USA
Zip Code: 42451
Country: USA
 
Record
SN07100191-F 20240619/240617230122 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.