Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 05, 2024 SAM #8256
SOLICITATION NOTICE

Y -- FY24 Lake Marion Orangeburg Berkeley Phase 2-Water Line

Notice Date
7/3/2024 9:57:28 AM
 
Notice Type
Presolicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT CHARLESTO CHARLESTON SC 29403-5107 USA
 
ZIP Code
29403-5107
 
Solicitation Number
W912HP24R0004
 
Response Due
6/25/2024 10:00:00 AM
 
Archive Date
08/25/2024
 
Point of Contact
Evelyn Halliburton-Shannon, Phone: 8433298208, Addison Layfield, Phone: 8433298194
 
E-Mail Address
evelyn.i.halliburton-shannon@usace.army.mil, addison.g.layfield@usace.army.mil
(evelyn.i.halliburton-shannon@usace.army.mil, addison.g.layfield@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
PURPOSE OF THIS ANNOUNCEMENT: This announcement constitutes a pre-solicitation announcement of a proposed contract action pursuant to FAR 5.204. This is not a solicitation. No response is requested at this time. A formal solicitation will follow this announcement with full details, including a response deadline, the complete price proposal schedule, the construction�plans & specifications, instructions to offerors, and the evaluation factors/basis for award. OFFERORS ARE RESPONSIBLE FOR MONITORING THIS WEBSITE FOR CHANGES TO THIS NOTICE AND THE FORMAL SOLICITATION ANNOUNCEMENT. PLANNED SOLICITATION: The final Solicitation for this project will be�announced anytime between 15 and 30 days after the posting of this pre-solicitation.The contract type will be firm-fixed-price. DESCRIPTION OF WORK: the furnishing, installing, and placing into successful operation approximately 40,703 LF of 20-inch diameter water main pipe, 2,398 LF of 26-inch diameter horizontal directionally drilled pipe, booster pump station, and all associated work. The contract includes all pipe, valves, appurtenances, roadway bores, horizontally directionally drilled pipe, backfill, compaction, testing, quality control, safety, and all other related work required to place the project into successful operation. This contract will be a portion of the Lake Marion Regional Water System with portions owned, operated, and maintained by both Santee Cooper and Berkeley County. The Contractor will be responsible for coordinating work with local utility owners, property owners, Lake Marion Water Treatment Plant personnel, and Berkeley County. As posted on SAM.gov on 09 May 2024, under the same requirement number, the solicitation will include Brand Name requirements for the following equipment: Equipment Description� � � � � � � � Manufacturer SCADA System� � � � � � � � � � � � � �Dorsett Controls Booster Pump Station� � � � � � � � � EFI-Solutions MAGNITUDE OF WORK: $10,000,000 TO $25,000,000 The contractor must be registered in WWW.SAM.GOV prior to award of the�solicitation.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/8ecc1e1671714e8fa65de4bc13a8dc3d/view)
 
Place of Performance
Address: Charleston, SC 29403, USA
Zip Code: 29403
Country: USA
 
Record
SN07117168-F 20240705/240703230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.