Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 05, 2024 SAM #8256
SOLICITATION NOTICE

Y -- 15 Mile Bayou Channel Enlargement � Item 3

Notice Date
7/3/2024 9:32:24 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W07V ENDIST MEMPHIS MEMPHIS TN 38103-1894 USA
 
ZIP Code
38103-1894
 
Solicitation Number
W912EQ24B0010
 
Response Due
8/6/2024 10:00:00 AM
 
Archive Date
08/21/2024
 
Point of Contact
Kimberly Bass, Phone: 9015793648, Priscilla Sweeney, Phone: 9015443117
 
E-Mail Address
kimberly.e.bass@usace.army.mil, priscilla.g.sweeney@usace.army.mil
(kimberly.e.bass@usace.army.mil, priscilla.g.sweeney@usace.army.mil)
 
Small Business Set-Aside
8A 8(a) Set-Aside (FAR 19.8)
 
Description
The purpose of the project is to provide Flood Risk Management (FRM) for the rural areas and future developments near West Memphis, Arkansas.�The project will also provide drainage improvements to West Memphis, Arkansas designed to a 10-year level of protection. The Fifteen Mile Bayou�Item 3 channel enlargement channel mile 21.7 to 25.4 consist of 3.7 miles of channel enlargement. Fifteen Mile Bayou, Item 3 will be widened from�an existing bottom width of 20 feet to a bottom width of 40 feet along its length from Mile 21.4 to 25.4. The channel enlargement will be�constructed on one bank only to provide the environmental benefit of leaving vegetation on the opposite bank. The channel bank that work is being�performed may vary and will be delineated in the contract documents. A 40-foot berm will be provided from bayou top of bank to the toe of slope�for a newly constructed spoil embankment where material from the enlargement will be stored. Large excavation capability such as a dragline may�be needed to fulfill contract requirements within the specified period of performance. Erosion/sediment control measures such as NRCS drop�structures and rip rap chutes will be constructed where lateral streams/drainage ditches enter the improved channel. An environmental planting�bench will be installed for one mile within the limits of the project. Fine grading and transitional channel work will be required to ensure smooth�channel transition between existing bridge structures. The proposed project will involve coordination of existing utilities within the construction�footprint. The work shall be located near West Memphis, Arkansas. Base Period of Performance: 300 calendar days. Option 1 Period of Performance: 340 calendar days. Option 2 Period of Performance: 70 calendar days. Only the Base will be obligated at time of award.�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/7c0a4a7cfce84d518542faea31a8825a/view)
 
Place of Performance
Address: West Memphis, AR 72301, USA
Zip Code: 72301
Country: USA
 
Record
SN07117170-F 20240705/240703230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.